Work Centers by Plan Group (tirou0101m400)
Field Information
- Site
-
The ID of the site to which the plan group belongs.
- Plan Group
-
The plan group ID.
- Work Center
-
The work center ID and description.
- Work Center Type
-
The work center type.
Allowed values
- Work Center
-
A regular work center that defines an area, typically bounded by yellow lines, where job shop operations are done and machines are present.
- Sub Work Center
-
Note: If the value Job Shop by Site parameter is Active in the Implemented Software Components (tccom0100s000) session, this option is not available.
A work center that belongs to a higher-level work center in order to review aggregated capacity.
- Subcontracting
-
If an operation must be subcontracted, a subcontracting work center must be defined. You cannot link operation-rate codes for this work-center type. However, you can record planning data by subcontracting work center, irrespective of the selected critical capacity type. If a work center is of the Subcontracting type, you cannot change the work-center type.
- Costing
-
The work center is a costing work center.
- Buffer
-
An assembly line work station where no operations are carried out, but orders wait pending transfer to the next work station.
- Line Station
-
A work center that is part of an assembly line. A line station is used in the production of final assembly schedule items.
- Work Cell
-
A grouping of one or more work stations in a fixed sequence defined in the Work Cells (tirpt0140m000) session, dedicated to repetitive manufacturing. Work cells are used for manufacturing items based on production models.