Standard Cost by Cost Type (tipcs3561s000)
Use this session to display the total standard cost for a project per cost type as material costs, operation costs, surcharges and general costs.
Field Information
- Project
- Currency
-
The currency in which the costs are expressed.
- Material Costs
-
The variable part of the estimated costs which have been posted to the relevant cost component, when the estimated standard cost is being calculated for the project. These costs are operation costs, material costs, etc.
- Total Estimated Amount
-
The total estimated costs which have been posted to the relevant cost component, when the estimated standard cost is being calculated for the project. These costs are operation costs, material costs, etc.
- Total Actual Amount
-
The total actual costs which have been posted to the relevant cost component, when the actual standard cost is being calculated for the project. These costs are operation costs, material costs, etc.
- Material Costs
-
The variable part of the budgeted costs which have been posted to the relevant cost component, when the estimated standard cost is being calculated for the project. These costs are operation costs, material costs, etc.
Note: During the standard cost calculation for the project, the budgeted costs are loaded directly from the budget calculation! - Total Budget Amount
-
The total budgeted costs which have been posted to the relevant cost component, when the estimated standard cost is being calculated for the project. These costs are operation costs, material costs, etc.
Note: During the standard cost calculation for the project, the budgeted costs are loaded directly from the budget calculation!