Project Parts (tipcs2111m000)
Use this session to create and/or display project parts.
You can maintain project parts in the details session.
You can make a product structure for an item in the:
- Project Parts (tipcs2111m000) session
- Item - Production (tiipd0101m000) session
- Generate (Project) Structure for Product Variant (tipcs2220m000) session
A project part is added in the Project Parts (tipcs2111m000) session. The Quantity field for this project is 0. This means that a product variant structure is available, but is not taken into account when calculating the project costs.
Field Information
- Project
-
Enter the code of the project for which you want to enter project part data.
- Project Status
-
Indicates the current progress of the project.
- Item
-
The customized or standard item that is entered as a project part.
- Description
-
The description of the project.
- Effectivity Unit
-
Enables you to generate a requirements planning based on the combination of item and effectivity unit. The unit that is connected to the item is always the unit of the top item.
- Freeze Standard Cost on Date
-
If this check box is selected, the estimate is based on the fixed standard cost. LN retrieves the standard cost which was valid on the date entered.
If this check box is cleared, the latest standard cost is retrieved.
- Freeze Standard Cost Date
-
The standard cost that is valid on the date specified in this field is taken for the standard cost calculations.
- Quantity
-
The quantity of the customized or standard item.
- Project Type
-
Is used to characterize projects. A project can have one of the following types:
- Project Part
- Inventory Unit