Check CPQ Settings in Generic Subcontracting Model (tipcf3215m300)

Use this session to check the CPQ settings for the generic subcontracting model.

Initially, LN checks for a loop in the selected generic subcontracting model. If the loop exists, the errors are printed on the report.

LN also checks for the CPQ settings when both the product and material are generic items in the generic subcontracting list of material line. An error message is generated when:
  • The product is configured by CPQ and material is configured by PCF
  • The product is configured by CPQ completely, but the component is configured by CPQ – structure by PCF
  • The product is configured by PCF, but the component is configured by CPQ
  • The product is configured by CPQ – structure by PCF, but the component is completely configured by CPQ
Note: This session can be accessed only if the Configurations by Site field is set to Activeor In Preparation and the Product Configurator (PCF) check box is selected in the Implemented Software Components (tccom0100s000) session.

Field Information

Selection Range
Use the fields in the Selection Range group box to specify the range of generic subcontracting models for which the CPQ settings must be checked.
Selection Range
Production Site
The code of the site where subcontracted production is performed.
Options
Validation Date
If this check box is selected, you must specify a date against which the validity of the selected generic subcontracting list of material lines is checked.
Date
The date and time on which the CPQ settings are checked for the generic subcontracting model. Generic subcontracting list of material lines need to be valid on this date and time.
Note: This value is enabled only if the Validation Date check box is selected.