Validate Generic Subcontracting Model (tipcf3215m200)

Use this session to check whether the generic subcontracting model is complete and valid.

LN checks:
  • If material lines exist for the generic subcontracting model
  • If the Supply System of materials is Order Controlled/Single in the Product Subcontractor Bill of Material (tisub1110m000) session
  • If there are no loops are in the multilevel product structure
Note: This session can be accessed only if the Configurations by Site field is set to Activeor In Preparation and the Product Configurator (PCF) check box is selected in the Implemented Software Components (tccom0100s000) session.

Field Information

Selection Range
Use the fields in the Selection Range group box to specify the range of generic subcontracting models that must be validated.
Selection Range
Production Site
The code of the site associated with the generic subcontracting models that must be validated.
Options
Print Valid BOMs
If this check box is selected, LN prints only the bill of materials (BOMs) that are successfully validated.