Check CPQ Settings in Generic Job Shop Bill of Material (tipcf3211m300)

Use this session to check the CPQ settings for the generic job shop bill of material (BOM).

Initially, LN checks for a loop in the generic job shop bill of material for the selected product and version. If the loop exists, the errors are printed on the report.
LN also checks for the CPQ Settings when both the product and material are generic items in the generic job shop list of material line. An error message is generated when:
  • The product is configured by CPQ and material is configured by PCF
  • The product is configured by CPQ completely, but the component is configured by CPQ – structure by PCF
  • The product is configured by PCF, but the component is configured by CPQ
  • The product is configured by CPQ – structure by PCF, but the component is completely configured by CPQ
Note: This session can be accessed only if the Configurations by Site field is set to Active or In Preparation and the Product Configurator (PCF)and the Infor Configurator (CPQ) check box is selected in the Implemented Software Components (tccom0100s000) session.

Field Information

Selection Range
Use the fields in the Selection Range group box to specify the range of generic job shop bill of material data for which the CPQ settings must be checked.
Options
Validation Date
If this check box is selected, you must specify a date against which the validity of the selected generic job shop bill of material lines is checked.
Date
The date and time on which the CPQ settings are checked for the generic job shop bill of material. Generic job shop bill of material lines need to be valid on this date and time.
Note: This field is enabled only if the Validation Date check box is selected.