Detect Loops in Generic Structure (tipcf3211m100)

Use this session to detect the loops in the generic job shop bill of material (BOM) and in the generic subcontracting model.

Note: This session can be accessed only if the Configurations by Site field is set to Active or In Preparation and the Product Configurator (PCF) check box is selected in the Implemented Software Components (tccom0100s000) session.

Field Information

Selection Range
Use the fields in the Selection Range group box to specify the range of generic job shop bill of material (BOM) or generic subcontracting model data in which the loops must be detected.
Options
Check for Loops Against Date
If this check box is selected, the loops are checked for the specified date.
Date
The date and time on which the loops in the generic job shop bill of material and the generic subcontracting model must be checked. Only generic job shop bill of material lines and generic subcontracting model lines that are valid for the specified date and time are checked.

This field is enabled only if the Check for Loops Against Date check box is selected.

Stop at first Loop
f this check box is selected, LN stops checking for the loops when the first loop is detected in the generic job shop bill of material and the generic subcontracting model.
Print Verified Structures
If this check box is selected, LN prints also the structures that have no loops. Structures which have a loop are always printed.