Received Production Bill of Material Line (timfc3660m000)
Use this session to view the details of the production bills of material line that is received from Product Lifecycle Management (PLM).
- The Engineering Revisions check box is selected in the Implemented Software Components (tccom0100s000) session.
- The Job Shop by Site field is set to Active in the Implemented Software Components (tccom0100s000) session.
- The Originating App field is set to PLM (Internal) or PLM (external) in the Item Base Data Parameters (tcibd9199m000) session.
Tabs
- Alternative Materials
Refers to the Received Production BOM - Alternative Materials (timfc3161m000) session. On this tab, you can view all the alternative material lines of the production bill of material line received from PLM.
- Reference Designators
Refers to the Received Production BOM - Reference Designators (timfc3162m000) session. On this tab, you can view all the reference designators of the production bill of material line received from PLM.
Field Information
- Received Revision
-
- Product
-
The code of the product associated with the production bill of material received from PLM.
- Source Revision
-
The revision of the production BOM from which the production bill of material revision is generated.
- Received
-
- Position
-
The position number of the material line associated with the received production bill of material.
- Item
-
The code of the item for which the production bill of material is generated.
- Net Quantity
-
The net quantity of the received production bill of material.
- BOM Unit
-
The unit in which the received production bill of material is expressed.
- Scrap Percentage
-
The percentage of the net material requirements that can be defined as a scrap in the production bill of material. This is also considered as a the scrap factor, and as a fixed quantity, percentage of the scrap quantity.
- Scrap Quantity
-
The actual quantity of the material of the received production bill of material that can be defined as a scrap.
- Length
-
The value that is used to calculate the net quantity if the inventory unit is Length or area unit. In case of area unit, this field is used in combination with Width.
The Length, Width, Size Unit and Number of Units fields apply only if the material has length or an area inventory unit, such as meter and square meter. The inventory unit is defined in the Items (tcibd0501m000) session.
- Width
-
The value that is used to calculate the net quantity if the inventory unit is Width or area unit. In case of area unit, this field is used in combination with Length.
The Length, Width, Size Unit and Number of Units fields apply only if the material has length or an area inventory unit, such as meter and square meter. The inventory unit is defined in the Items (tcibd0501m000) session.
- Size Unit
-
The unit of measurement for Length and Width.
- Number of Units
-
The number of times that the required quantity of the material, specified in the Length field and/or the Width field, displays in the product.
- Percentage Required
-
The percentage of raw material that must be available before the operation can be started.
Note: This field is applicable only if the Infor SCM Scheduler check box is selected in the Production Order Parameters (tisfc0100s000) session. - Replaces Item
-
The material from the previous bill of material revision, which is now a use-up material. As long as the use-up material is present in inventory, this item is used instead of the material specified in the Item field.
- Allow Multiple Items
-
If this check box is selected, LN can distribute the net quantity of the material over multiple alternative items. For example, the net quantity can be divided over the use-up material and the standard material or over the standard material and one or more alternative materials.
If this check box is cleared, LN issues only a single item for this BOM line for one production order.
Note: This field is applicable only if the Alternative Materials and/or the Use Up Material check box is selected in the Implemented Software Components (tccom0100s000) session. - Phantom
-
If this check box is selected, the material or component of the received production bill of material is a phantom.
- Standard Configuration
-
If this check box is selected, the received production bill of material line is part of the standard configuration of the product.
Note: This field is applicable only if the Unit Effectivity check box is selected in the Implemented Software Components (tccom0100s000) session. - Inherit Demand Peg
-
If this check box is selected, the demand peg exists for the material if the demand peg exists for the production order.
Note: This field is applicable only if the Demand Pegging check box is selected in the Implemented Software Components (tccom0100s000) session. You can also use this field to determine whether the material must have this demand peg as well. - Text
-
If this check box is selected, the text related to the received production bill of material line exists.