Processed Production Bill of Material (timfc3650m100)

Use this session to view the created production bill of material (PBOM) revision including the list of materials.

Note: This session can be accessed from the Received Production Bills of Material (timfc3150m000) session, only if:
  • The Engineering Revisions check box is selected in the Implemented Software Components (tccom0100s000) session.
  • The Job Shop by Site field is set to Active in the Implemented Software Components (tccom0100s000) session.
  • The Originating App field is set to PLM (Internal) or PLM (external) in the Item Base Data Parameters (tcibd9199m000) session.

Tabs

The lines on the tabs refer to these sessions:
  • Materials

    Refers to the Processed Production Bill of Material Lines (timfc3160m100) session. On this tab, you can view all the received material lines of the created production bill of material revision.

Field Information

Product
The code of the product associated with the processed production bill of material that is received from PLM.
Revision
The revision of the production bill of material received from PLM.
Status
The status of the processed production bill of material received from PLM.

Allowed values

New
Approved
Expired
Bill of Material
BOM Quantity
The BOM quantity of the received production bill of material.
Unit
The unit in which the BOM quantity is expressed.
Use BOM Units
If this check box is selected, LN uses the BOM units for the processed production bill of material.
Note: This field is applicable only if the BOM Units on Material Lines check box is selected in the Product Engineering Parameters (timfc0100m000) session.
Revision
Effective Date
The date and time from which the processed production bill of material is valid.
Expiry Date
The date and time up to which the processed production bill of material is valid.
Text
If this check box is selected, the text related to the processed production bill of material exists.
Source
Source
The source of the received production bill of material.

Allowed values

Manual

The P-BOM is defined in the Production Bills of Material (timfc3100m000) session.

Production Bill of Material

The P-BOM revision was generated from an existing production bill of material.

Engineering Bill of Material

The P-BOM is generated from an engineering bill of material.

Note: If the P-BOM is generated from an E-BOM, the Source Engineering Item and Source Revision fields are filled.
PLM

The P-BOM is generated from data imported from PLM.

Configurator (PCF)

The P-BOM is generated from data imported from the PCF configurator.

Configurator

The P-BOM is generated from data imported from Infor Configurator.

Job Shop Bill of Material

The P-BOM was generated from a job shop bill of material.

Not Specified
Note: By default, this field is set to PLM.
Source Item
The code of the source item for which the production bill of material is defined.
Source Revision
The revision of the source item for which the production bill of material is defined.