Received Production Bill of Material (timfc3650m000)

Use this session to to view the details of the production bill of material data that is received from Product Lifecycle Management (PLM).

Note: This session can be accessed only if:
  • The Engineering Revisions check box is selected in the Implemented Software Components (tccom0100s000) session.
  • The Job Shop by Site field is set to Active in the Implemented Software Components (tccom0100s000) session.
  • The Originating App field is set to PLM (Internal) or PLM (external) in the Item Base Data Parameters (tcibd9199m000) session.

Tabs

The lines on the tabs refer to these sessions:

  • Materials

    Refers to the Received Production Bill of Material Lines (timfc3160m000) session. On this tab, you can view all the received material lines of the production bill of material (BOM) received from PLM.

Field Information

Received Revision
Product

The code of the product associated with the production bill of material (BOM).

Source Revision

The revision of the production bill of material (BOM) in PLM.

Revision Status

The status of the received revision.

Allowed values

Received
Processed
Rejected
Received On

The date and time when the production bill of material is received from PLM.

Received By

The logon code of the user who receives the production bill of material from PLM.

Source

The source of the production bill of material.

Allowed values

Not Specified
Manual
Production Bill of Material
Engineering Bill of Material
Configurator (PCF)
Configurator
PLM
Job Shop Bill of Material
Production Model (RPT)
Subcontracting Model
Processed On

The date and time when the production bill of material received from PLM, is processed.

Processed By

The logon code of the user who processes the production bill of material from PLM.

Rejected On

The date and time when the production bill of material received from PLM, is rejected.

Rejected By

The logon code of the user who rejected the production bill of material from PLM.

Received
Effective Date

The date and time from which the received production bill of material is valid.

Expiry Date

The date and time up to which the received production bill of material is valid.

BOM Quantity

The BOM quantity for the received production bill of material.

Unit

The inventory unit in which the BOM quantity is expressed.