Process EBOM Changes (tiedm3205m000)
Use this session to generate single-level EBOMs for the revisions which have been generated or modified by MBCs. The single-level EBOMs are based on the E-items from the E-Item by MBC (tiedm3122m000) session and on the order lines from the MBC Action (tiedm3120m000) session.
Field Information
- Selection Range
-
- MBC Number
-
Enter a range of MBCs, whose changes to EBOMs you want to process.
- Option
-
- Approve New Revisions by Engineering
-
If this check box is selected, the status of new revisions is automatically set to Approved by Engineering after their EBOMs have been generated.
If this check box is cleared, you must approve revisions using the Engineering Item Revision (tiedm1100m000) session.
- Create Links to Documents attached to Component and Revision
-
If this check box is selected, all documents attached to the component or engineering item revision in Data Management , are copied to the EBOM.
Note: This option is Object Data Management (DM) based and not available in the Cloud.