EBOM Copy Data (tiedm1120m000)
Use this session to generate and maintain the copy data for a single-level engineering BOM.
You can alter the details of the data of a particular line in the EBOM Copy Data (tiedm1120m000) details session. You can also use this session to change data generated by the Generate EBOM Copy Data (Multilevel) (tiedm1230m000) session and the Generate EBOM Copy Data by MBC (tiedm3235m000) session.
Field Information
- Engineering Item
-
Enter the single-level EBOM's parent E-item that you want to copy.
- E-Item Revision
-
Enter the parent E-item revision of the single-level EBOM that you want to copy.
- Main Item
-
Enter the parent item of the target production BOM (that is, the BOM to which you want to copy the single-level EBOM).
- Position Number
-
The target position number of the PBOM line.
- Component Type
-
Defines whether the component is an E-Item or Item.
- Component
-
The source component in the EBOM line.
- EBOM Copy Method
-
The copy method used by LN for copying the EBOM to the production BOM.
Allowed values
- EBOM to Production BOM Only
-
Only copy one line from the EBOM to the PBOM.
- Copy E-Item to Item
-
Copy the E-item to an item, and copy the relevant EBOM line to the PBOM line.
- NonProj Item to Proj Item
-
Do not copy an E-item or EBOM, but copy a non-project item to a project item. That is, a standard item to a customized item. Also copy the non-project item's bill of material and routing to the project item's BOM and routing. This option is only available if you select the Customize Copied Item check box in the Engineering Data Management Parameters (tiedm0100m000) session.
- No Copy Action
-
No components are copied. This occurs in the following circumstances:
- The unit of the source component does not match the unit of the target component.
- There is no valid approved revision of the E-item.
- A project item is copied to an unrelated project item.
- Finalized to Position
-
The line number of the target production BOM, that is, the BOM to which you want to copy the data.
- Sequence Number
-
The sequence number of the target BOM.
- Item Category
-
The item category of the target item.
- To Item
-
The target component item in the PBOM, which is the BOM line to which you want to copy the EBOM line.
- E-BOM Text
-
If this check box is selected, a text is present.
- Length
-
The length of the component in the EBOM line.
Note:Length can also be used to calculate Net Quantity:
Net Quantity = Length x Width x Number of Units.
- Width
-
The width of the component in the EBOM line.
Note:Width can also be used to calculate Net Quantity:
Net Quantity = Length x Width x Number of Units.
- Size Unit
-
The unit of measurement used.
- Number of Units
-
The number of times the component occurs in the length (or area). For a physical item, this is equal to the number of units in the length or area defined.
It can also be used to calculate Net Quantity:
Net Quantity = Length x Width x Number of Units.
- Net Quantity
-
The net quantity of the component in the EBOM line.
This is the amount of the component item used in the E-item.
This can be calculated by multiplying the Number of Units, Length, and Width.
Example: If ten units of a component 2 cm long and 3 cm wide are specified, the net quantity is calculated as 60. If the width is not specified, the net quantity is 20.
Note: You cannot define negative net quantities in the Engineering Data Management module. - Extra Information
-
From the Extra Info field in the Engineering Bill of Material (tiedm1110m000) session.
You can use this field to enter a short note about the item or the BOM line.
- Description
-
The description or name of the code.
- E-Item Copied
-
If this check box is selected, then the E-item has already been copied to an item.
- E-Item Copy Date
-
The date on which the E-item was copied to an item.
- EBOM Copied
-
If this check box is selected, the single-level EBOM has already been copied to a production BOM.
- EBOM Copy Date
-
The date on which the EBOM was copied to a PBOM.
- Description
-
The name of the parent E-item revision of the single-level EBOM that you want to copy.
- Quantity Independent
-
If this check box is selected, the E-item's net quantity is copied to update the scrap quantity in the BOM.
If this check box is cleared, the E-item's net quantity is copied to update the net quantity of the BOM.