Print Operation Times Deviation against Norm (ticst1402m000)

Use this session to print the differences between the actual spent hours and the norm times which have been recorded in the routing for the product.

You can only print operations:

  • With an estimated number of hours present in the Estimated vs. Actual Hours Costs (ticst0502m000) session.
  • For which the deviation percentage between the estimated and the actual numbers of hours is not greater than the percentage entered on the Maximum Deviation Allowed field.

Field Information

Site

The site ID.

Note: Only visible if multisite functionality is active.

Work Center

If this check box is selected, you can specify the range of work centers where the orders are performed.

Operation

If this check box is selected, you can specify the operations of the production order.

Reference Operation

If this check box is selected, you can specify the task of the operation.

Maximum Deviation Allowed

Only the operations which have a deviation percentage greater than the allowed deviation percentage are printed. The deviation percentage is calculated from the difference between estimated and actually spent hours.

Exclude Already Printed Orders

If this check box is selected, LN does not print the already printed orders.

Result on Hours for Setup and Production

If this check box is selected, the time deviation is printed for setup as well as for production.