Subcontracting WIP (ticst0607m000)
Use this session to view the subcontracting WIP costs.
The tabs refer to the following sessions:
Estimated Subcontracting
Subcontracting WIP Amounts (ticst0580m000)Actuals by Cost Component
Subcontracting WIP Actual Amounts (ticst0509m000)WIPActuals by Project Peg
Subcontracting WIP Actual Amounts by Project Peg (ticst0509m100)
Field Information
- Site
-
The site ID.
Note: Only visible if multisite functionality is active. - Production Order
-
The production order the subcontracting WIP belongs to.
- Position
-
The position number that identifies the estimated material in the Estimated Materials (ticst0101m000) session.
- Sending WIP
-
If this check box is cleared, the displayed amounts are related to the subassembly that is sent to the subcontractor.
If this check box is selected, the displayed amounts are related to the subassembly that is received from the subcontractor.
- Total Amount
-
The total cost of subcontracted WIP for the production order.
- Total Quantity
-
The total quantity of subcontracted WIP materials for the production order.
- Subassembly
-
The description of the subassembly that is subcontracted.
- Quantity Balanced
-
If this check box is selected, the quantity of outgoing subassembly is equal on the quantity of incoming subassemblies.