Print Estimated vs. Actual Material Costs (ticst0401m000)

Use this session to print a report that compares the estimated material costs and the actual material costs for a production order.

Select the range of production orders for which you want to print the costing data. Then indicate:

  • If you also want to print the material costs by (costing) work center.
  • If only closed orders must be printed.
  • If LN must recalculate the estimates on basis of the progress of the order.

Field Information

Site

The site ID.

Note: Only visible if multisite functionality is active.

Costing Work Center

costing work center

Group by

Specify if and how the costs are grouped, by work center, or by costing work centers.

Currency for details

Select in which currency the costs must be printed.

Note: 
  • If the Currency System of your company is Single or Dependent, this field is enabled.
  • If the Currency System of your company is Independent, this field is disabled and displays Reference.

Print only if actual costs are higher then

Production orders are printed on the report if the production order's total actual material costs are higher then the specified estimated costs' percentage.

Print only if actual costs are lower then

Production orders are printed on the report if:

  • The production order's total actual material costs are lower then the specified estimated costs' percentage.
  • The production order's status is at least Production Completed.

Low costs can indicate costs that were incorrectly registered, for example, if backflushing is forgotten.

Note: If this check box is selected, production orders that are Active, Released, or Created are never printed.
Print corrected Estimates (based on progress)

If this check box is selected, LN corrects the calculated estimates on basis of the quantities reported in the order planning.

Print Closed Orders Only

If this check box is selected, LN only prints production orders with the Closed status.

Actual Closing date

Production orders are printed on the report if they are closed within the specified date range.

Include Supplied by Subcontractor

If this check box is selected, then estimated materials that are supplied by the subcontractor will be printed.

Include Customer Owned

If this check box is selected, the customer owned estimated materials will be printed.

Include Print Only

If this check box is selected, estimated materials with Material Control Method Print Only will be printed.