Standard Cost - Fixed and Variable (ticpr3505m100)
Use this session to display the cost type totals by item and effective date. The costs are broken down into fixed costs and variable costs.
The cost data is displayed if you:
- Carried out a standard cost calculation by using the standard cost-calculation code.
- Actualized the standard cost.
Field Information
- Item
- Enterprise Unit
- Financial Company
- Effective Date
- Sequence Number
-
Item costing data can be actualized several times. If item costing data is actualized two or more times while the effective date is the same (which can happen, for example, if you select Last Date of Previous Period as the effective date), the item costing data is distinguished by the sequence number.
You can only select Last Date of Previous Period if the Backdate Valuation Price Allowed check box in the Standard Cost Calculation Parameters (ticpr0100m000) session is selected.
- Inventory Unit
- Currency
-
- Fixed
-
The fixed, variable and total costs that are connected to cost components of the Material Costs cost type.
- Operation Costs
-
The fixed, variable and total costs that are connected to cost components of the Operation Costs cost type.
- Surcharge
-
The fixed, variable and total costs that are connected to cost components of the Surcharge cost type.
- General Costs
-
The fixed, variable and total costs that are connected to cost components of the General Costs cost type.
- Total Costs
-
The fixed, variable and total costs that are connected to cost components of the following cost types:
- Material Costs
- Operation Costs
- Surcharge
- General Costs