Item - Standard Cost Details (ticpr3505m000)

Use this session to display details of (simulated) standard cost by a specific effective date.

Field Information

Item

item

Enterprise Unit

enterprise unit

Note: Only visible if Standard Cost by Enterprise Unit in the Implemented Software Components (tccom0100s000) session is Active.
Effective Date

effective date

Sequence Number

Item costing data can be actualized several times. If item costing data is actualized two or more times while the effective date is the same (which can happen, for example, if you select Last Date of Previous Period as the effective date), the item costing data is distinguished by the sequence number.

You can only select Last Date of Previous Period if the Backdate Valuation Price Allowed check box in the Standard Cost Calculation Parameters (ticpr0100m000) session is selected.

Inventory Unit

inventory unit

Currency

home currency

Cost Component

cost component

Number of Units

The number of units in the form of either materials or hours, which are included in the product structure or standard cost structure, and which are saved under the relevant cost component during the standard cost calculation.

Added Amount Fixed

The fixed costs that are connected with the cost components of the item displayed in the session's header.

If a cost component is not only applicable for the item displayed in the header, but also for some component items in the item's BOM structure, the costs connected to that cost component are expressed in the Total Amount Fixed field.

Note: Fixed costs are always added to the standard cost of an item. If the Include Fixed Costs in Valuation Price field in the Standard Cost Calculation Parameters (ticpr0100m000) session is selected, fixed costs are also added to the item's valuation price.

Added Amount Variable

The variable costs that are connected with the cost components of the item displayed in the session's header.

If a cost component is not only used for the item displayed in the header, but also for some component items in the item's BOM structure, the costs connected to that cost component are expressed in the Total Amount Variable field.

Operation rates and surcharges are variable costs if the Variable Cost check box is selected in the following sessions:

  • Item Surcharges (ticpr1110m000)
  • Operation Rates (ticpr1150m000)
  • Assembly Line Surcharges (ticpr1180m000)
  • Project Surcharges (tipcs3120m000)

If the Variable Cost check box is cleared, the costs are considered as fixed costs.

Note: Fixed costs are always added to the standard cost of an item. If the Include Fixed Costs in Valuation Price field in the Standard Cost Calculation Parameters (ticpr0100m000) session is selected, fixed costs are also added to the valuation price.

Total Amount Fixed

The fixed costs that are connected with the cost components of the header item's parts.

The fixed costs that are directly linked to the item in the session's header are displayed in the Added Amount Fixed field.

Note: Fixed costs are always added to the standard cost of an item. If the Include Fixed Costs in Valuation Price field in the Standard Cost Calculation Parameters (ticpr0100m000) session is selected, fixed costs are also added to the valuation price.

Total Amount Variable

The variable costs that are connected with the cost components of the header item's parts.

The variable costs that are directly linked to the item in the session's header are displayed in the Added Amount Variable field.

Operation rates and surcharges are variable costs if the Variable Cost check box is selected in the following sessions:

  • Item Surcharges (ticpr1110m000)
  • Operation Rates (ticpr1150m000)
  • Assembly Line Surcharges (ticpr1180m000)
  • Project Surcharges (tipcs3120m000)

If the Variable Cost check box is cleared, the costs are considered as fixed costs.

Note: Fixed costs are always added to the standard cost of an item. If the Include Fixed Costs in Valuation Price field in the Standard Cost Calculation Parameters (ticpr0100m000) session is selected, fixed costs are also added to the valuation price.

Cost Component Type

cost component