Effective Cost Component Structure by Assembly Line and Item (ticpr3162m000)

Use this session to display the effective cost component structure by assembly line and item. The effective cost component structure is a result of running the Actualize Assembly Line Costing Data (ticpr0215m000) session. In the Effective Date field the date is displayed on which the assembly line costing data is actualized.

The effective cost component structure contains the aggregated cost components that are defined for the assembly line's items in the Item - Costing (ticpr0107m000) session. If you entered a chart for an assembly line in the Assembly Line Costing Data (ticpr0115m000) session, the detailed cost components that were defined for the chart in the Standard Cost Scheme Details (ticpr0110m000) session are included in the effective cost component structure.

Field Information

Assembly Line

assembly line

Item

The item for which the effective cost component structure is displayed.

Effective Date

The effective date, actualized in the Actualize Assembly Line Costing Data (ticpr0215m000) session.