Generate Operation Rates (ticpr1251m000)
Use this session to to generate new, date-effective operation rates from existing operation rates. You can generate the operation rates from the Operation Rates by Project (tipcs1150m000) and Operation Rates (ticpr1150m000) sessions.
You can run this session for multiple selection options and ranges.
-
This session is part of the Job Shop by Site adoption process and should be used at the start of the In Preparation phase of the conversion.
-
Project (PCS) specific operation rates will not be copied for the standard cost calculation code as defined in the Standard Cost Calculation Parameters (ticpr0100m000) session.
Field Information
- Project (PCS)
-
The project ID.
Default value
This field is empty by default.
- Cost Calculation Code
-
The selected cost calculation code range.
Default value
Standard cost calculation code from the Standard Cost Calculation Code field in the Standard Cost Calculation Parameters (ticpr0100m000) session.
- Operation Rate Code
-
The selected operation rate code range.
Default value
The full range is selected, if no range is specified.