Processed Job Shop Bill of Material Line (tibom5615m100)
Use this session to view the details of the processed job shop bill of material (BOM) line that is received from PLM.
- The Engineering Revisions check box is selected in the Implemented Software Components (tccom0100s000) session.
- The Job Shop by Site check box is selected in the Implemented Software Components (tccom0100s000) session.
- The Originating App field is set to PLM (Internal) or PLM (external) in the Item Base Data Parameters (tcibd9199m000) session.
Tabs
- Alternative Materials: Refers to the Processed Job Shop BOM - Alternative Materials (tibom5116m100) session. On this tab, you can view all the alternative material lines of the processed job shop bill of material received from PLM.
- Reference Designators: Refers to the Processed Job Shop BOM - Reference Designators (tibom5117m100) session. On this tab, you can view all the reference designators of the processed job shop bill of material received from PLM.
Field Information
- Site
- The code of the site associated with the processed job shop bill of material (BOM).
- Product
- The code of the product associated with the processed job shop bill of material.
- Source Model
- The ID of the source bill of material (BOM) from which the job shop bill of material is received.
- Source Revision
- The revision of the source bill of material that is received.
- Position
- The position number of the processed job shop bill of material line.
- Item
- The code of the material that is used for production.
- Replaces Item
- The material from the previous BOM revision, which is now a use-up material. If the use-up material exists in inventory, that is used instead of the material specified in the Item field.
- Bill of Material
- The bill of material associated with the processed job shop bill of material.
- Revision
- The revision number of the processed job shop bill of material.
- Status
-
The status of the job shop bill of material (BOM) model.
Allowed values
- New
- Approved
- Expired
- Quantities
-
- Net Quantity
- The net quantity of material required to manufacture the selected product.
- Unit
- The unit in which the net quantity of the material is expressed.
- Net Quantity in BOM Unit
- The net quantity of material
needed to manufacture the selected product expressed in BOM unit.Note: This field is displayed if the BOM Units on Material Lines check box is selected in the Product Engineering Parameters (timfc0100m000) session.
- BOM Unit
- The unit in which the net quantity of the
material is expressed.Note: This field is displayed if the BOM Units on Material Lines check box is selected in the Product Engineering Parameters (timfc0100m000) session.
- Scrap Percentage
- The expected relative material loss, for example due to faulty components. The gross quantity should be increased to compensate for these material losses.
- Scrap Quantity
- The quantity of material that will be lost
during production. The quantity is a fixed quantity that is independent to the
quantity produced. Recording a scrap quantity prevents shortages in
production.Note: This field is displayed if the BOM Units on Material Lines check box is selected in the Product Engineering Parameters (timfc0100m000) session.
- Scrap Quantity in BOM Unit
- The quantity of the material lost in
production that is expressed in BOM unit.Note: This field is displayed if the BOM Units on Material Lines check box is selected in the Product Engineering Parameters (timfc0100m000) session.
- Size Unit
- The unit of measurement of Length and Width fields.
- Length
- The length of the material that is used to
calculate the net quantity if the inventory unit is Length or area unit. In case of area unit, this field is used in combination
with Width.Note: The Length, Width, Size Unit and Number of Units fields are applicable apply only if the material has length or an area inventory unit, similar to meter and square meter. The inventory unit is defined in the Item (tcibd0501m100) session.
- Width
- The length of the material that is used to
calculate the net quantity if the inventory unit is Width or area unit. In case of area unit, this field is used in combination
with Length.Note: The Length, Width, Size Unit and Number of Units fields are applicable apply only if the material has length or an area inventory unit, similar to meter and square meter. The inventory unit is defined in the Item (tcibd0501m100) session.
- Number of Units
- The number of times that the required quantity of the material, specified in the Length and/or Width field, appears in the product.
- Percentage Required
- Indicates the percentage of raw material
required to start the operation.Note: This field is applicable only if the Infor SCM Scheduler check box is selected in the Implemented Software Components (tccom0100s000) session.
- Supply
-
- Operation
- Indicates the ID of the operation for which the material is required.
- Warehouse
- The code of the warehouse from which the production materials are delivered.
- Lot Selection
-
The lot selection of the processed job shop bill of material (BOM).
Allowed values
- Any
-
The goods received or shipped are not subject to specific lot conditions. You can use more than one lot.
- Same
-
You can select any lot for receipt or shipment, but the entire receipt or shipment must have the same lot.
- Specific
-
You can receive or ship only one, specific lot.
- Customer Furnished Material
- If this check box is selected, the specific material is a customer furnished material.
- Contains Customer Furnished Material
- If this check box is selected, end-item is an item that is built using one or more customer furnished material.
- Inherit Demand Peg
- Indicates whether the production order
associated with the job shop bill of material can have a demand
peg.Note: This field is applicable only if the Project Pegging check box is selected in the Implemented Software Components (tccom0100s000) session.
- Supplied by Subcontractor
- If this check box is selected, the specified material is supplied by subcontractor.
- Phantom
- If this check box is selected, the specified material or component is a phantom.
- Miscellaneous
-
- Report Material
-
Indicates the method in which the material is consumed.
Allowed values
- Backflush
-
This is an automatic calculation based on reported quantities.
- Manual
-
Reporting is done by an employee using the Machine Work List (tisfc4600m000) session.
- By Machine
-
Reporting is done via machine operations instead of per operation.
- MES
-
Reporting is done by the integrated Manufacturing Execution System.
- By Machine Group
-
Reporting is done by machine in the Report Operations Completed (tisfc0130m000) session.
- Undefined
-
This applies to Report Machine Hours on converted orders. Reporting is based on the Labor Hours value.
- Not Applicable
-
No reporting is necessary.
- Allow Multiple Items
- If this check box is selected, LN can
distribute the net quantity of the material that is required over multiple items.
For example, the net quantity can be divided over the use-up material
and the standard material or over the standard material and one or more
alternative materials. If this check box is cleared, LN issues only a single
item specified in the job shop bill of material for the production order.Note: This field is applicable only if the Alternative Materials or the Use Up Material check box is selected in the Implemented Software Components (tccom0100s000) session.
- Standard Configuration
- If this check box is selected, the job shop
bill of material line is part of the standard configuration of the
product.Note: This field is applicable only if the Unit Effectivity check box is selected in the Implemented Software Components (tccom0100s000) session.
- Print on Order Document
- If this check box is selected, the received job shop bill of material components are printed on the order document.
- Specify Material Offset
- If this check box is selected, you can specify the lead time offset for the material.
- Material Offset
- The lead-time offset for the availability of the component in days or hours depending on the selected time unit.
- Material Offset Unit
-
The time unit, days or hours, in which the material offset is defined.
Allowed values
- Days
- Hours
- Text
- If this check box is selected, a text related to the processed job shop bill of material line exists.