Received Job Shop Bill of Material Line (tibom5615m000)
Use this session to view the details of the job shop bill of material (BOM) line that is received from PLM.
Note: This session can be accessed only if:
- The Engineering Revisions check box is selected in the Implemented Software Components (tccom0100s000) session.
- The Job Shop by Site check box is selected in the Implemented Software Components (tccom0100s000) session.
- The Originating App field is set to PLM (Internal) or PLM (external) in the Item Item Base Data Parameters (tcibd9199m000) session.
Tabs
The lines on the tabs refer to these sessions:
- Alternative Materials: Refers to the Received Job Shop BOM - Alternative Materials (tibom5116m000) session. On this tab, you can view all the alternative material lines of the job shop bill of material received from PLM.
- Reference Designators: Refers to the Received Job Shop BOM - Reference Designators (tibom5117m000) session. On this tab, you can view all the reference designators of the job shop bill of material received from PLM.
Field Information
- Received Revision
-
- Site
- The code of the site associated with the received job shop bill of material.
- Product
- The code of the product associated with the received job shop bill of material.
- Source Model
- The ID of the source bill of material (BOM) from which the job shop bill of material is received.
- Source Revision
- The revision of the source job shop bill of material that is received.
- Received
-
- Position
- The position number of the received job shop bill of material line.
- Item
- The code of the material that is used for production.
- Warehouse
- The code of the warehouse from which the production materials are used.
- Lot Selection
-
The received lot selection for the job shop bill of material.
Allowed values
- Any
-
The goods received or shipped are not subject to specific lot conditions. You can use more than one lot.
- Same
-
You can select any lot for receipt or shipment, but the entire receipt or shipment must have the same lot.
- Specific
-
You can receive or ship only one, specific lot.
- Net Quantity
- The net quantity of the material required to manufacture the product.
- BOM Unit
- The unit in which the net quantity and scrap quantity are expressed.
- Scrap Percentage
- The expected relative material loss, for example due to faulty components. The gross quantity should be increased to compensate for these material losses.
- Scrap Quantity
- The quantity of material that will be lost during production. The quantity is a fixed quantity that is independent to the quantity produced. Recording a scrap quantity prevents shortages in production.
- Size Unit
- The unit of measurement of Length and Width fields.
- Length
- The length of the material that is used to
calculate the net quantity if the inventory unit is Length or area unit. In case
of area unit, this field is used in combination with Width.Note: The Length, Width, Size Unit fields are applicable apply only if the material has length or an area inventory unit, similar to meter and square meter. The inventory unit is defined in the Item (tcibd0501m100) session.
- Width
- The length of the material that is used to
calculate the net quantity if the inventory unit is Width or area unit. In case of
area unit, this field is used in combination with Length.Note: The Length, Width, Size Unit fields are applicable apply only if the material has length or an area inventory unit, similar to meter and square meter. The inventory unit is defined in the Item (tcibd0501m100) session.
- Percentage Required
- Indicates the percentage of raw material
required to perform the production process of the job shop bill of material.Note: This field is applicable only if the Infor SCM Scheduler check box is selected in the Implemented Software Components (tccom0100s000) session.
- Operation
- Indicates the ID of the operation where the selected material is used.
- Material Offset
- The lead-time offset for the availability of the component in days or hours depending on the selected time unit.
- Material Offset Unit
-
The time unit, days or hours, in which the material offset is defined.
Allowed values
- Days
- Hours
- Replaces Item
- The material from the previous BOM revision, which is now a use-up material. If the use-up material exists in inventory, that is used instead of the material specified in the Item field.
- Allow Multiple Items
- If this check box is selected, LN can
distribute the net quantity of the material that is required over multiple items. For
example, the net quantity can be divided over the use-up material and the
standard material or over the standard material and one or more alternative materials.
If this check box is cleared, LN issues only a single item specified in the job
shop bill of material for the production order.Note: This field is applicable only if the Alternative Materials or the Use Up Material check box is selected in the Implemented Software Components (tccom0100s000) session.
- Phantom
- If this check box is selected, the specified material or component is a phantom.
- Supplied by Subcontractor
- If this check box is selected, the specified material is supplied by subcontractor.
- Inherit Demand Peg
- Indicates whether the production order associated
with the job shop bill of material can have a demand peg.Note: This field is applicable only if the Project Pegging check box is selected in the Implemented Software Components (tccom0100s000) session.
- Contains Customer Furnished Material
- If this check box is selected, end-item is an item that is built using one or more customer furnished material.
- Customer Furnished Material
- If this check box is selected, the specific material is a customer furnished material.
- Print on Order Document
- If this check box is selected, the job shop bill of material component is printed on the order document.
- Specify Material Offset
- If this check box is selected, you can specify the lead time offset for the material.
- Standard Configuration
- If this check box is selected, the job shop bill
of material line is part of the standard configuration of the
product.Note: This field is applicable only if the Unit Effectivity check box is selected in the Implemented Software Components (tccom0100s000) session.
- Text
- If this check box is selected, a text related to the received job shop bill of material line exists.