Where-Used BOM Component (tibom1512m000)
Use this session to display the manufactured items in which a particular item occurs as a component. This is useful when you want to replace components.
To select a component for which you want to know in which items it is included, use the Find Record Button. You can also specify a particular BOM position number.
You can tab through each of the component items with the Next Group button, showing their parent manufactured item.
Field Information
- Manufactured Item
-
The product in which the component item occurs.
Note:To print the information displayed in this session, use the following sessions:
- Print Where-Used BOM Components (tibom1412m000)
- Site
-
The site ID.
- Position
-
The component's position number.
- Sequence Number
-
The sequence number is a subdivision of the position number.
- Item
-
The component item for which you want to know in which manufactured items it is used. You must already have defined the item in the Item - Production (tiipd0101m000) session.
- Quantity
- Quantities
-
- Length
-
This field can be used, together with the Width field and number of units, to calculate the net quantity.
The net quantity is the Length field multiplied by the number of units and multiplied by the Width field, if applicable.
In the Print Production Order Documents (tisfc0408m000) session, you can only print a sawing list if you have entered the Length field for the given component. If you have entered both the Length field and the Width field, you can print a cutting list.
- Width
-
This field can be used, together with the Length field and number of units, to calculate the net quantity.
The net quantity is the Length field multiplied by the number of units and multiplied by the Width field, if applicable.
If you have entered both the Length field and the Width field, you can print a cutting list in the Print Production Order Documents (tisfc0408m000) session.
- Number of Units
-
The number of times that the required quantity of the material, specified in the Length field and/or the Width field, appears in the product.
- Inventory Unit
-
The inventory unit in which quantities of the main item are expressed.
- Net Quantity
-
The amount of a component item used in the manufactured item.
To calculate this amount, multiply the number of units by the value in the Length field and the value in the Width field. For example, if you specify ten units of a component that is 2 cm long and 3 cm wide, the net quantity is 60 (10*2*3). If the width is not specified, the net quantity is 20.
Note: If a negative quantity is shown, the production of a manufactured item results in a by-product. This by-product is entered in the bill of material with a negative quantity, which is used to calculate the gross material requirement.Quantity-independent lines
If the BOM lines are quantity independent, a zero is displayed in this field.
- Percentage Required
-
The percentage of raw material that must be available before the operation can be started.
- Scrap Percentage
-
Recording a scrap factor prevents shortages in production. The scrap factor is expressed as a percentage loss.
A scrap factor of 5% means that LN will allocate 5% more of a component for a production order (gross material requirement).
Scrap is an extra loss in addition to the loss caused by the yield being less than 100%.
If you generate the BOM from an engineering BOM, the scrap factor and scrap quantity values will also be copied. However, these values will only be copied if the sequence number is the only thing changed, for example, wheel 10/1 to wheel 10/2. If there is a new item on the BOM line, for example, wheel to spare wheel, the scrap data will not be copied. In this case, the scrap quantity and scrap factor will be zero (0).
- Scrap Quantity
-
The quantity of material that will be lost during production. The quantity is a fixed quantity that is independent to the quantity produced. Recording a scrap quantity prevents shortages in production.
Scrap is an extra loss in addition to the loss caused by the yield being less than 100%.
If you generate the BOM from an engineering BOM, the scrap factor and scrap quantity values will also be copied. However, these values will only be copied if the sequence number is the only thing changed, for example, wheel 10/1 to wheel 10/2.
If a new item exist on the BOM line, for example, wheel to spare wheel, the scrap data will not be copied, In this case scrap quantity and scrap factor will be 0.
- Validity
-
- Effective Change Order
-
The change order that defines the effective date of the BOM line.
- Effective Date
- Expiry Change Order
-
The change order that defines the expiry date of the BOM line.
- Expiry Date
-
The date the bill of material (BOM) is no longer valid.
- Standard Configuration
-
If this check box is selected, the BOM line is part of an item’s standard configuration. The costs for the BOM line are included in the standard cost. If the Standard Configuration check box is cleared, the BOM line is not part of an item’s standard configuration. The costs for the BOM line are not included in the standard cost.
The Standard Configuration check box in combination with the setting of the Valid check box in the Exceptions (tcuef0105m000) session indicates whether an BOM line is used for a specific effectivity unit.
- If the Standard Configuration check box is selected, and the Valid check box is cleared for an exception linked to the BOM line, the BOM line will be omitted for a specific effectivity unit or requirement.
- If the Standard Configuration check box is cleared, and the Valid check box is selected for an exception linked to the BOM line, the BOM line will be added for a specific effectivity unit or requirement.
Note: If the BOM line has exceptions attached, but you do not want to use the exceptions, for example, for selling spare parts, or for an end item which is not unit-effective, then you can clear this check box. - Exceptions Present
-
If this check box is selected, this BOM line has exceptions linked to it. Exceptions are part of the unit effectivity concept.
- Properties
-
- Phantom
-
If this check box is selected, the component item is defined as a phantom in the Item - Production (tiipd0101m000) session. You can use phantom items to record technical information about the product structure or to carry out standard cost calculations.
Note:- If the component item is a phantom, you cannot define alternative materials.
- If the Main Item is a phantom, a check mark is displayed on the header and derived from the Item - Production (tiipd0101m000) session.
- If the Item is a phantom, the check box on the BOM line is selected.
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Phantoms.
- Use Phantom Inventory
-
If this check box is selected, LN checks if any phantom inventory is available.
If the phantom item is available in inventory, and the quantity is sufficient, this inventory is used as component in the production order.
If no phantom inventory is available, or if the quantity is insufficient, the inventory is not used. LN treats the component as a normal phantom item, so the phantom is exploded for the total quantity.
Note: The phantom stock is always ignored during planning. - Print on Order Document
-
If this check box is selected, the BOM component is printed on the order document.
Users can specify whether or not they want to print a BOM material on the order document. For example, a user can choose not to print the floor stock in the material list.
- Link with EDM
-
If this check box is selected, the engineering bill of material line was copied to the production bill of material.
- Exploded by Infor Planning
-
If this check box is selected, the bill of material (BOM) is exploded using Infor Planning.