Check Project Peg Indicators (tibom1222m000)
Use this session to check if project pegs from a manufactured item or generic item are inherited by the relevant components in an exploded BOM.
Field Information
- From Item
-
Select the range of manufactured items or generic item to be checked.
Note:If this session is started from the Generic Bill of Material (tipcf3110m000) session, only items with a generic BOM are part of the selection range.
If this session is started from the Bill of Material (tibom1110m000) session, only items with a production BOM are part of the selection range.
- Check Effectivity against Date
-
If this check box is selected, BOM lines with an effectivity date before the selected date and an expiry date after the selected date are checked.
- Print Error Messages Only
-
If this check box is selected, only items with a BOM that contains a loop or where the inheritance of the project peg is not possible are printed.