Remix Line Mix (tiasl3220m000)
Use this session to recalculate line mixes for a range of assembly lines and planned offline dates. The new mix uses the existing mix as starting point.
Field Information
- Include Backlog Orders
-
You can check this option if the offline date of these backlog orders is before the date you entered in the Planned Offline Date field. These backlog orders will then be taken into account when remixing is performed.
- Rebuild Utilization (Maximum Orders)
-
If this check box is selected, the line utilization will be rebuilt.
- Order Priority
-
If this check box is selected, order priority is taken into account when remixing is carried out. This priority was manually defined in the Priority field in the Assembly Order (tiasc2100s000) session.
- Mix Modified
-
This check box indicates whether the mix was changed in the remixing process. If the mix was changed, the changes in Cost function are displayed.