Assembly Lines (tiasl1530m000)
Use this session to display and define the general and costing data of an assembly line.
Field Information
- Assembly Line
- Company
- Site
-
The site ID.
- WIP Transfer Handling
-
How the WIP transfer is carried out.
- Configuration Dependent
-
If this check box is selected, the supply line can be included in the assembly line network model or exluded from the assembly line network model which is planned to be used for the assembly of the end item.
For more information, refer to
- Linking a supply line to multiple parent lines (Divergent assembly line structure)
- Assembly line selection— Configuration Dependent parameter
- Synchronizing a supply line with mutiple parent lines
- Transportation time for linked assembly lines
- Calendar Code
-
The calendar code and availability type combination specified in the parameters, that defines the working times of the assembly line.
Note: If you are working in a different company from the company specified for the assembly line, this field will be empty and unavailable. - Costing data
-
- Cost Component Scheme
-
The cost components scheme for the assembly line.
- Calculation Office
-
Specify the line station that you want to use as the calculation office for this assembly line. After the final assembly line of the assembly orders is closed, the WIP is transferred to the calculation office.
Note:- If you are working in a different company from the company of the assembly line, this field will be empty and unavailable.
- In Assembly Control, this line station is used for administrative purposes only.
- Assembly Order Horizon
- Refresh Horizon
-
The time taken to refresh assembly orders.
- Miscellaneous
-
- Calendar Last Processed On
-
The date the calendar linked to the assembly line was updated.
- Assembly Line Structure Status
-
The status of the assembly line structure.
Allowed values
- Modified
- Validated
- Actualized
- Last Sequence Date
-
Is updated with the current date when a new line sequence is confirmed after rescheduling. This is to enable checking if the supplying line is sequenced after its parent lines are sequenced.