Print Operation Analysis (tiasc5401m000)
Use this session to to print operation anaysis.
Field Information
- Sort by
-
Select in which order the data is sorted:
Allowed values
- Line Stations by Assembly Order
- Assembly Orders by Line Station
- Assembly Order
- Line Station
- Start Date
- The range of dates that determine the period for which the analysis is performed. For the calculation of the workload, only line station orders (LSOs) whose start date falls in this range are considered.