Planned Orders (Assembly) (tiapl5136m000)

Use this session to view planned assembly orders that are specific for a forecast item and base model. The order generation process generates planned assembly orders for forecast quantities, which are not yet fulfilled by actual orders.

Your Concept

Field Information

Scenario

The scenario ID.

Note: This value is defaulted from the Scenarios (cprpd4100m000) session.
Order Type

The type of order.

Allowed values

Not Applicable
Planned Assembly Order
Note: This field can be set to Planned Assembly Order only.
Planned Order

The order number of the assembly order.

Forecast Item

The code of the forecast item.

Base Model

The code of the base model for the forecast item.

Note: This field is displayed only if Base Models check box is selected in the Product Configuration Parameters (tipcf0100m000) session.
Quantity

The order quantity.

Order Status

The status of the order.

Allowed values

Planned

You can still modify the planned order.

Firm Planned

LN does not change the start date or the order quantity of the order if you set the Planning Method field to Forward. LN does not change the finish date or quantity of the order if you set the Planning Method field to Backward.

You can still modify the planned order details.

Confirmed

The planned order has been confirmed. If the planned order belongs to the actual scenario, you can now transfer it to the execution level.

Note: This field can be set to Planned only.
Planning Method

The method to calculate the planned start date and planned finish date.

Allowed values

Forward

For a production order, the planning of the production order is based on a fixed start date. A delivery date is calculated from the order run time.

For a project, the network planning for the project is executed on the basis of a fixed start date. When you start the planning in the Generate Network Planning (tppss2240m000) session, LN determines the project's delivery date with a Forward planning method.

Backward

For a production order, the planning of the production order is based on a fixed delivery date. A start date is calculated from the order run time.

For a project, the network planning for the project is executed on the basis of a fixed delivery date. When you start the planning in the Generate Network Planning (tppss2240m000), LN determines the project's start date with a Backward planning method.

Note: The field can be set to Backward only.
Requirement Date

The requirement date for the planned order.

Planned Start Date

The planned date and time to start work on the order.

Planned Finish Date

The planned date and time to finish the work on the order.

Planner

The employee responsible for planning the order.

Name

The name of the employee.

BOM Revision

The revision number of the BOM.

Note: A combination of Forecast item, Base model, and BOM revision must exist in the Planning Bills of Material (tiapl5126m000) session.