Planned Orders (Assembly) (tiapl5136m000)
Your Concept
Field Information
- Scenario
-
The scenario ID.
Note: This value is defaulted from the Scenarios (cprpd4100m000) session. - Order Type
-
The type of order.
Allowed values
- Not Applicable
- Planned Assembly Order
Note: This field can be set to Planned Assembly Order only. - Planned Order
-
The order number of the assembly order.
- Forecast Item
-
The code of the forecast item.
- Base Model
-
The code of the base model for the forecast item.
Note: This field is displayed only if Base Models check box is selected in the Product Configuration Parameters (tipcf0100m000) session. - Quantity
-
The order quantity.
- Order Status
-
The status of the order.
Allowed values
- Planned
-
You can still modify the planned order.
- Firm Planned
-
LN does not change the start date or the order quantity of the order if you set the Planning Method field to Forward. LN does not change the finish date or quantity of the order if you set the Planning Method field to Backward.
You can still modify the planned order details.
- Confirmed
-
The planned order has been confirmed. If the planned order belongs to the actual scenario, you can now transfer it to the execution level.
Note: This field can be set to Planned only. - Planning Method
-
The method to calculate the planned start date and planned finish date.
Allowed values
- Forward
-
For a production order, the planning of the production order is based on a fixed start date. A delivery date is calculated from the order run time.
For a project, the network planning for the project is executed on the basis of a fixed start date. When you start the planning in the Generate Network Planning (tppss2240m000) session, LN determines the project's delivery date with a Forward planning method.
- Backward
-
For a production order, the planning of the production order is based on a fixed delivery date. A start date is calculated from the order run time.
For a project, the network planning for the project is executed on the basis of a fixed delivery date. When you start the planning in the Generate Network Planning (tppss2240m000), LN determines the project's start date with a Backward planning method.
Note: The field can be set to Backward only. - Requirement Date
-
The requirement date for the planned order.
- Planned Start Date
-
The planned date and time to start work on the order.
- Planned Finish Date
-
The planned date and time to finish the work on the order.
- Planner
-
The employee responsible for planning the order.
- Name
-
The name of the employee.
- BOM Revision
-
The revision number of the BOM.
Note: A combination of Forecast item, Base model, and BOM revision must exist in the Planning Bills of Material (tiapl5126m000) session.