Planning Bill of Material Lines (tiapl5127m000)
Field Information
- Forecast Item
-
The code of the forecast item.
- Base Model
-
The code of the base model.
Note: This field is enabled only if the Base Models check box is selected in the Product Configuration Parameters (tipcf0100m000) session. - Revision
-
The revision number of the BOM.
- Position
-
The position number of the BOM line.
- Item
-
The code of the assembly part, engineering module, or the standard part directly below the level of the displayed main item in the product variant structure.
Note: The Item must be of the type Product or Engineering Module (Obsolete). - Item Type
-
The item type.
Allowed values
- Product
- Purchased
- Manufactured
- Generic
- Cost
- Service
- Subcontracted service
- List
- Tool
- Equipment
- Engineering module
- Rental Product
- Order System
-
The order system of the item.
Allowed values
- SIC
- Planned
- FAS item
- Manual
- Configurable
-
Indicates if the item is a configured item.
- Fixed
-
If this check box is selected, the assembly item is considered as a standard component in the item configuration.
- Planning Percentage
-
The percentage for which this planning line must be considered.
Note:- This field is enabled only if the Fixed check box is cleared.
- The value of this field is set to 100 when the Fixed check box is selected.
- Planning Quantity
-
The planning quantity of a component in a BOM is used in the enterprise planning calculation when determining the average requirements for this component.
- Unit
-
The unit in which the quantity is expressed.
- Assembly Line
-
The code of the assembly line.
Note: This field is enabled only if the Order System field is set to value other than FAS. - Line Segment
-
The code of the line segment.
Note: This field is enabled only if the Order System field is set to value other than FAS. - Station
-
The code of the line station.
Note: This field is enabled only if the Order System field is set to value other than FAS. - Lead Time Offset
-
The lead-time offset.
- Plan Item
-
The plan item.
Note: The cluster of the main item (forecast item) can be used to create the plan item code for the sub item.