Planning Bills of Material (tiapl5126m000)
Your Concept
Field Information
- Forecast Item
-
The code of the forecast item.
Note: The item is applicable only if the Forecast Item Type is set to Product in the Items - Forecasting (tiapl5101m000) session. - Base Model
-
The code of the base model.
Note:- This field is displayed only if the Base Models check box is selected in the Product Configuration Parameters (tipcf0100m000) session.
- It is possible to define a planning BOM without a base model. Such a planning BOM is used when the main item is also part of another planning BOM.
- Revision
-
The revision number of the BOM.
- Status
-
The status of the BOM.
Allowed values
- New
- Approved
- Expired
- Effective Date
-
The date and time from which the BOM is effective.
- Expiry Date
-
The date and time up to which the BOM is effective.
- Source
-
The source of the BOM.
Allowed values
- Manual
-
The P-BOM is defined in the Production Bills of Material (timfc3100m000) session.
- Production Bill of Material
-
The P-BOM revision was generated from an existing production bill of material.
- Engineering Bill of Material
-
The P-BOM is generated from an engineering bill of material.
Note: If the P-BOM is generated from an E-BOM, the Source Engineering Item and Source Revision fields are filled. - PLM
-
The P-BOM is generated from data imported from PLM.
- Configurator (PCF)
-
The P-BOM is generated from data imported from the PCF configurator.
- Configurator
-
The P-BOM is generated from data imported from Infor Configurator.
- Job Shop Bill of Material
-
The P-BOM was generated from a job shop bill of material.
- Not Specified
Note: By default, this field is set to Manual. - Created On
-
The date and time when the BOM is created.
- Created By
-
The employee who creates the BOM.
- Approved On
-
The date and time when the BOM is approved.
- Approved By
-
The employee who approves the BOM.
- Expired On
-
The date and time when the BOM is expired.
- Expired By
-
The employee by who sets the BOM status is to Expired.