Validating Assembly Lines
The following checks can be performed on the assembly line model integrity:
- There are no divergent line structures and segments present.
- There is correct usage of cost components and calculation office.
- The definition of the line segment structure. For example, if it start with a buffer, connected in a chain and so on.
- The definition of the work centers. The supplying line must feed a line station on the main line.
- The definition of assignments is correct. For example, one or more active average and non-average assignments must be present.
- There must be no gaps in the assembly lines.
- There must be no loops in the assembly line cycles.
- There must be one enterprise unit present for each assembly line.
Start the Assembly Lines (tiasl1530m000) session:
-
Select the assembly line. Click Validate Assembly Lines (tiasl1230m000) session starts.
on the appropriate menu. TheNote that clicking
is not a mandatory step. This step is automatically performed when you actualize the assembly lines, which is a step to be completed later on in the process. This intermediate option allows you to check the assembly line structure. -
Ensure that main line and supplying line are specified in the selection range.
-
Click LN sets the status of the assembly line structure to Validated for the main line and supplying lines.
. Check the report. If the process runs without errors, -
Check that your lines have the Validated status. When a line is created/validated/actualized, lines undergo a change and are set/reset to the Modified status.
Actualizing Assembly Lines
Start the Assembly Lines (tiasl1530m000) session:
-
Select the assembly line. Click Actualize Assembly Lines (tiasl1231m000) session starts.
on the appropriate menu. The -
Click LN sets the status of the assembly line structure to Actualized for the main line and supplying line.
. Check the report. Analyze and correct issues, if required. If the process runs without errors,