Integration Scheme for Standard Cost Calculation (tffbs1130s000)
Use this session to define an integration scheme by dimension/reference unit. This data is used to integrate the Standard Cost Calculation module with the Project Control module in LN.
Field Information
- Logistic Company
-
The logistic company for which the rates/surcharges must be integrated.
- Dimension Type
-
Note: You can only use dimension types that are selected in the Budgets (tffbs0503m000) session.
- Dimension
-
The dimension to which booked costs are integrated.
- Reference Unit
-
The reference unit to which the integration scheme applies.
- Sequence No.
-
The integration-scheme number for the budget and the reference unit.
- Reference Unit Type
-
The usage of a reference unit.
- Rate/Surcharge link with Standard Cost Calc.
-
The cost-price calculation type.
- Project
-
The project in the Project Control module.
Note:- You cannot use completed project, a cancelled project, or an archived project
- You cannot select the Engineering Allowed check box in the Projects (tipcs2101m000) session.
- Operation Rate
-
The operation rate to which you can integrate a cost rate.
- Item Group
-
The item group to which similar items are grouped.
Note: Either the item or the item group applies one integration scheme. - Item
-
The item to which the calculated surcharge must stored.
Note:- Either the item or the item group applies one integration scheme
- Only manufactured or purchased items are allowed
- The Standard To Order field in the Item - Production (tiipd0101m000) session must be cleared.
- The items for which the Surcharges by Item field is selected in the Item - Costing (ticpr0107m000) session are allowed.
- Booking Triggered by
-
The moment that item surcharges are added to the valuation price.
- Warehouse
-
The warehouse in which the calculated surcharges must be stored.
Note: You can use warehouses for which the Surcharges by Warehouse field is selected in the Item - Costing (ticpr0107m000) session.