Budget Structure Ranges (tfbgc1140m000)
Use this session to define a range of dimensions for the selected budget and the year.
Defining a range eases the process of setting up the budgetary roll up structures for your enterprise.
Field Information
- Budget Year
-
The year for which the budget is valid. The year corresponds to the fiscal year defined in the General Ledger module.
- Short Description of Year
-
The description or name of the code.
- Budget
-
The budget for which you define the range.
- Description
-
The description or name of the code.
- Budget Level
-
The budget level. For a budget structure, you can define up to nine summary levels.
- Level 1 of a roll up structure always determines how the accounts on your ledger chart of accounts (ledger detail accounts) roll up to the first summary level of budget accounts.
- Levels 2 through 9 always determine additional summary levels within your budgetary roll up structure. Allotment, commitment, encumbrance, expense, payment, and available balances on levels 2 through 9 are always the sum of the balances of the level immediately below them ( Example, the balance at Level 2 always equals the sum of the balances of the budget accounts at Level 1).
- Range Sequence
-
The sequence number.
- Account
-
The budget account code.
- Dimension 1
- Account Description
-
The description or name of the code.
- Account Description
-
The description or name of the code.
- Template
-
If this check box is selected, every combination in the range of selected ledger accounts and dimension codes will generate a budget account with the same syntax. The mapping to the combination of ledger account and dimension codes are done simultaneously.
- Account
-
The From and To fields define a range of: budget account.
- Account To
-
The From and To fields define a range of: budget account.
- Account All Values
-
If this check box is selected, separate budget accounts are generated for each value specified in the range.
- Dimension 1 From
-
The From and To fields define a range of: dimensions
- Dimension 1 To
-
The From and To fields define a range of: dimensions
- Dimension 1 All Values
-
If this check box is selected, separate budget accounts are generated for each value specified in the range.
Note: The check box must be selected for at least one account or dimension range.