RFQ Criterion Scoring Schemes (tdpur1193m000)
Use this session to specify objective and subjective values and scores to criterions.
Example
Criterion | Objective value % | Score | Valid for range |
---|---|---|---|
Quantity | -10 | -10 | -10 to 100 |
Quantity | 0 | 100 | 0 |
Quantity | 10 | 50 | 0 to 10 |
Quantity | 20 | 20 | 10 to 20 |
Quantity | 30 | 10 | 20 to 30 |
The objective value in this example is the difference between the RFQ quantity and the response quantity expressed as a percentage of the RFQ quantity. As a result, if the RFQ quantity is 100 units and the response quantity is 85 units, the objective value would be 15.
Field Information
- Criteria Set
-
RFQ criteria set
- Criterion Type
-
The type of criterion for which the value and score are applicable.
Allowed value
- Subjective
- Criterion
-
Note: You can specify a subjective criterion only if the Criterion Type field is set to Subjective.
- Deviation Value
-
The value assigned to the objective criterion.
- String Value
-
The subjective value assigned to the subjective criterion.
Allowed values
You can specify a subjective value only if the Criterion Type field is set to Subjective.
- Score
-
The score assigned to the criteria values. The score is taken into account when calculating the total score by criterion.
- Scoring Sequence
-
The sequence number of the scoring for the specified combination of Criteria Set, Criterion Type and Criterion.
Note: By default, the application increments this value by 1 when a new scheme is defined. - Specific Value
-
If this field is set to Yes a value for a deviation, deviation percentage, string value or value yes/no can be entered. When the value is set to No than the scoring line will be used as fallback in case no other scoring line is valid during the compare.
- Operator
-
The operator based on which the criterion demands are defined.
Note:- This field is enabled only if:
- The Criterion Type is set to Objective.
- The specified Criterion is Quantity, Delivery Time, Expiry Date, Last Time Buy Date, Manufacture Date or Quantity (Percentage)
- The Specific Value check box is selected.
- You can set this field to a value other than <> and refers to.
- This field is enabled only if:
- Description
-
The description or name of the code.
- Deviation Unit
-
The unit in which the Deviation Value is expressed.
Allowed values
- Hours
- Days
- Weeks
- Months
- Years
- Not Applicable
Note:- This field is enabled only if:
- The Deviation Value is specified.
- The Criterion Type is set to Objective.
- The specified Criterion is Quantity, Delivery Time, Expiry Date, Last Time Buy Date or Manufacture Date.
- This field can be set to Days and Weeks only.
- Deviation Percentage
-
The deviation percentage for the quantity.
Note:- This field is enabled only if:
- The Criterion Type is set to Objective.
- The specified Criterion is Quantity (Percentage).
- The Specific Value check box is selected.
- The specified value must be unique for a combination of Criteria Set, Criterion Type, Criterion, Specific Value and Operator
- This field is enabled only if:
- Value (Yes/No)
-
If this check box is selected,
Note:- This field is enabled only if:
- The Criterion Type is set to Objective.
- The specified Criterion is Carrier Binding, Invoice by Stage Payments, Last Time Buy, Warranty or End of Life
- The Specific Value check box is selected.
- The specified value must be unique for a combination of Criteria Set, Criterion Type, Criterion, Specific Value and Operator
- This field is enabled only if: