Item - Ordering by Site (tcibd2150m000)

Use this session to view, specify, and maintain the item ordering data for a site.

Note: This session is available only if you use multisite.

Field Information

Item

item

Site

site

Use Global Item Ordering

If this check box is selected, the global item ordering data is used for the site. Consequently, changes to the item data at company level are synchronized automatically to the site level.

Order Method

The item's order method.

Allowed values

Lot for Lot
Economic Order Quantity
Fixed Order Quantity
Replenish to Maximum Inventory

Warehouse

The default warehouse in which the item is stored.

You must specify a default item warehouse for items of these types:

  • Product
  • Generic
  • List (type kit)
Order Increment

order quantity increment

Note: 
  • LN verifies this quantity when planned orders are generated.
  • If you select the Lot Size Calculation Allowed check box, LN updates this field when you run the Global Update of Inventory Parameters (whina2200m000) session.

Minimum

The minimum order quantity for the item.

Note: If you select the Lot Size Calculation Allowed check box, LN updates this field when you run the Global Update of Inventory Parameters (whina2200m000) session.

Example

  • The economic stock is 100
  • The reorder point is 230
  • The order method is Lot for Lot
  • The minimum order is quantity 800

As a result, LN generates a planned order for 800 instead of an order for 130 (230-100).

Maximum

The maximum order quantity for the item.

Note: If you select the Lot Size Calculation Allowed check box, LN updates this field when you run the Global Update of Inventory Parameters (whina2200m000) session.

Example

  • The economic stock is 100
  • The reorder point is 530
  • The order method is Lot for Lot
  • The maximum order quantity is 400

As a result, LN generates two orders for 400 each instead of a single planned order for 430 (530-100).

Fixed Order

The fixed order quantity for the item.

Note: If you select the Lot Size Calculation Allowed check box, LN updates this field when you run the Global Update of Inventory Parameters (whina2200m000) session.

Example

The order method is Fixed Order Quantity and the Fixed Order Quantity is 20.

If you require 70 units, LN will generate four orders for 20 units each (a total of 80 units).

Performance aspects

The setting of this field could affect system performance and database growth. For more information, refer to Fixed order quantity.

Economic Order Quantity

The economic order quantity for the item.

Example

LN generates a planned order for 20 units of an item with a SIC order system and the Economic Order Quantity order method.

  • The economic order quantity is 30 units
  • The minimum order quantity is 25

As a result, the order is adjusted to 30 units.

Reorder Point

reorder point

Interval

order interval

Order Interval Unit

Select Hours or Days as the time unit in which you want to express the order interval.

Order Costs

order costs

Currency

The currency in which the costs are expressed.

Safety Time

safety time

Service Level

The service level percentage determines to what extent the item can be delivered directly from inventory.

Example

A service level of 95% means that in 95% of all cases customer demand must be satisfied by immediate delivery. In other words, 'no' is accepted in 5% of the cases.

Note: A service level of 100% is not recommended, because it causes an infinitely high safety stock.
Safety Stock

The safety stock for the item.

Note: The safety stock must be less than or equal to the maximum inventory and/or the re-order point.
Maximum Inventory

If the order method is Replenish to Maximum Inventory, LN generates purchase orders or production orders for the quantities of the item that are required to reach this inventory level.

Seasonal Pattern

The seasonal pattern for safety stock.

Seasonal Pattern

The seasonal demand pattern for the item.

First Allowed Order Date

The first date on which an order is allowed to be created for the item.

LN checks this date when you manually specify a purchase order or a production order and also when Enterprise Planning creates a planned order for this item.

You can also specify a value for this field in the Item Data by Warehouse (whwmd2510m000) session. That field applies to a specific combination of item and warehouse.

Note: If the Order Interval has a value > 0, LN populates the date on which a planned order or order is generated plus the value of the Order Interval in this field.
Lot Size Calculation Allowed

If this check box is selected, LN automatically updates the item's inventory and order data when you run the Global Update of Inventory Parameters (whina2200m000) session.

Recommended Order Quantity Project

The recommended order quantity for the PCS project. The recommended order quantity is the total required quantity of a customized item as specified in the project structure. The recommended order quantity is calculated using the Calculate Standard Costs by Project (tipcs3250m000) session.

Order Quantity

The item's order quantity for a PCS project.

LN needs the order quantity for the following purposes:

  • The calculation of the setup costs for operations during the estimated project calculation.
  • The calculation of the lead-time offset.
Use Recommended Quantity

If this check box is selected, LN replaces the Order Quantity Project with the Recommended Order Quantity Project when you run one of the following sessions:

  • Calculate Estimated Cost by Project (ticpr2211m000)
  • Calculate Standard Costs by Project (tipcs3250m000)
Planner

planner

You can use the planner as a criterion to select or group production orders in Warehousing and Manufacturing .

Safety Time Unit

Select Hours or Days as the time unit in which you want to express the safety time.

Last allowed Order Date

The last date on which an order can be created for the item.

LN checks this date when you manually specify a purchase order or a production order and also when Enterprise Planning creates a planned order for this item.

You can also specify a value for this field in the Item Data by Warehouse (whwmd2510m000) session. That field applies to a specific combination of item and warehouse.

Job Shop Scheduling
Ignore Availability Constraint (Scheduling)

If this check box is selected, the material availability check for the selected item is ignored during scheduling.

Note: 
  • This field is displayed only if the Production Scheduler check box is selected in the Implemented Software Components (tccom0100s000) session is active.

  • If there are defaults defined for the selected site, the value for the Allow Ignoring Material Availability Constraints field is obtained from Item Ordering Defaults by Site (tcibd2151m000) session.

  • If no defaults are present for the selected site, the Allow Ignoring Material Availability Constraints can be set for item types Product.