Date-Effective Supply Source (tcibd0510m000)

Use this session to list the date-effective supply sources (default and actual) of Purchased, Manufactured, or Product items.

You can temporarily change the default supply source of the items in the Date-Effective Supply Source (tcibd0110s000) details session.

Field Information

Item

item

Position

The line position number.

Effective Date

The effective date of the supply source on this line.

Expiry Date

The expiry date of the supply source on this line.

Default Supply Source

The default supply source determines the default supply method for the item when the inventory on hand is not sufficient.

Note: You can temporarily change the supply source of Purchased, Manufactured or Product items in the Date-Effective Supply Source (tcibd0510m000) session.

Allowed values

Job Shop

A bill of material (BOM) and routing are available for the item. The demand is filled by a production order.

Repetitive

A list of materials and a work cell are available for the item. The demand is filled by a production schedule.

Assembly

An assembly bill of material (BOM) and assembly lines are available for the item. The demand is filled by an assembly order.

Purchase

No production data is available for item. The demand is filled by a purchase order.

Subcontract

The item is supplied by subcontracting the production process. A bill of material (BOM) is specified for this item.

Note: The Subcontracting with Material Flow check box must be selected to select this supply source.
Distribution

The item is supplied by a planned distribution order.

Actual Supply Source

The supply source that is used to replenish the inventory on hand for the current date.

Allowed values

Job Shop

A bill of material (BOM) and routing are available for the item. The demand is filled by a production order.

Repetitive

A list of materials and a work cell are available for the item. The demand is filled by a production schedule.

Assembly

An assembly bill of material (BOM) and assembly lines are available for the item. The demand is filled by an assembly order.

Purchase

No production data is available for item. The demand is filled by a purchase order.

Subcontract

The item is supplied by subcontracting the production process. A bill of material (BOM) is specified for this item.

Note: The Subcontracting with Material Flow check box must be selected to select this supply source.
Distribution

The item is supplied by a planned distribution order.