Generate Master Data (tccom0231m000)

Use this session to generate item default data by site, item data by site, and other master data by site during the In Preparation stage of the site activation process.

It is recommended to generate the item default data by site first, followed by the item data by site and the other master data by site and to validate the results of each step using the Validate Master Data for Multisite (tccom0230m100) session.

Field Information

Item Defaults

If this check box is selected, item control and default data by site is generated.

Planning Defaults

If this check box is selected, item default data by site is generated based on data from the Item Planning Defaults (cprpd1110m000) session.

Common

If this check box is selected, general item data by site is generated.

Warehousing

If this check box is selected, Warehousing item data by site is generated.

Planning

If this check box is selected, Enterprise Planning item data by site is generated.

Manufacturing

If this check box is selected, Manufacturing item data by site is generated.

Procurement

If this check box is selected, Purchase Control item data by site is generated.

Sales

If this check box is selected, Sales Control item data by site is generated.

Service

If this check box is selected, Service item data by site is generated.

Project

If this check box is selected, Project item data by site is generated.

Quality

If this check box is selected, Quality item data by site is generated.

Freight

If this check box is selected, Freight item data by site is generated.

Common

If this check box is selected, general master data by site is generated.

Manufacturing

If this check box is selected, Manufacturing master data by site is generated.

Procurement

If this check box is selected, Purchase Control master data by site is generated.

Sales

If this check box is selected, Sales Control master data by site is generated.

Service

If this check box is selected, Service master data by site is generated.

Project

If this check box is selected, Project master data by site is generated.

Quality

If this check box is selected, Quality master data by site is generated.

Freight

If this check box is selected, Freight master data by site is generated.

Warehousing

If this check box is selected, Warehousing master data by site is generated.

Process Report

If this check box is selected, a report is printed showing the generated or simulated results based on the specified settings.

Error Report

If this check box is selected, a report is printed showing the errors that occurred during the process.

Simulation

If this check box is selected, the process is run in simulation mode, that is, the process is not actually run, but a preview of the results is generated if you select the Process Report check box.

If your environment comprises multiple companies, you can select the company for which you want to run the simulation.

Size Simulation

The number of records that must be simulated.

If you specify a value of 100, the first 100 records that fall within the selection criteria must be simulated.

Default value

The default value is zero, which means all records that fall within the selection range are simulated.

From Item

item