Test Calendar Date Planning (tcccp0121m000)
use this session to plan the activities for a project based on the calendar date.
Field Information
-
- Company
-
The code of the company for which the planning is done.
- Calendar
-
The calendar code based on which the planning is done.
- /
-
The availability type associated with the calendar.
- Time Zone
-
The time zone for which the planning is done.
- Date
-
The date and time for which the planning is done.
- Lead Time
-
The lead time based on which the planning is done.
- Lead Time Unit
-
The lead-time unit for the lead time.
- Plan Method
-
The method used for the planning of the activities.
Allowed values
- Forward
-
For a production order, the planning of the production order is based on a fixed start date. A delivery date is calculated from the order run time.
For a project, the network planning for the project is executed on the basis of a fixed start date. When you start the planning in the Generate Network Planning (tppss2240m000) session, LN determines the project's delivery date with a Forward planning method.
- Backward
-
For a production order, the planning of the production order is based on a fixed delivery date. A start date is calculated from the order run time.
For a project, the network planning for the project is executed on the basis of a fixed delivery date. When you start the planning in the Generate Network Planning (tppss2240m000), LN determines the project's start date with a Backward planning method.
-
If this check box is selected, the early start and finish date is used for planning.
-
Specify when the calendar data must be considered for planning.
Allowed values
- Start
-
The earliest start date is considered for planning.
- Finish
-
The earliest finish date is considered for planning.
-
- Calendar Start Date
-
The planned start date and time calculated by LN.
- Calendar End Date
-
The planned start date and time calculated by LN.