Use this session to to create and maintain process capability control chart.
Field Information
- Origin
-
The origin of the order.
Allowed values
- Sales
- Storage Inspection
- Production (RPT)
- Routing (RPT)
- Service
- Warehouse Transfer
- Maintenance Sales
- Batch Repair
- Maintenance Work
- Purchase
- Warehouse Transfer (Manual)
- Not Applicable
- Production (JSC)
- Material (BOM)
- Routing (TI)
- Sales Schedule
- Project
- Purchase Schedule
- Project Contract
- EP Distribution
- Inventory Inspection
- Item
-
The code of the item.
- Description
-
The description or name of the code.
- Business Partner
-
The buy-from business partner/ sold-to business partner.
Note: If you set the origin order to Purchase, you must enter a buy-from business partner in this field. If you set the origin order to Sales, you must enter a sold-to business partner in this field. - Description
-
The description or name of the code.
- Aspect
-
The code of the aspect.
- Description
-
The description or name of the code.
- Characteristic
-
The code of the characteristic.
- Description
-
The description or name of the code.
- Process Control Chart Type
-
The type of process control chart that must be generated.
Allowed values
- Xbar and R Control
- Not Defined
- Xbar and S Control
- XM and R Control
- Calculated Deviation Upper Control Limit
-
The calculated deviation upper control limit.
- Calculated Deviation Center Line
-
The calculated deviation center line.
- Calculated Deviation Lower Control Limit
-
The calculated deviation lower control limit.
- Target Deviation Upper Control Limit
-
The target deviation upper control limit.
- Target Deviation Center Line
-
The target deviation center line.
- Target Deviation Lower Control Limit
-
The target deviation lower control limit.
- Base Date From
-
The date from which the process capability control chart is generated.
- Base Date To
-
The date up to which the process capability control chart is generated.
- Upper Control Limit
-
The upper control limit.
- Calculated Mean Center Line
-
The actual measured mean of the process.
- Calculated Mean Lower Control Limit
-
The lower control limit.
- Target Mean Upper Control Limit
-
The upper control limit.
- Target Mean Center Line
-
The actual measured mean of the process.
- Target Mean Lower Control Limit
-
The lower control limit.