Action Result Details (qmpqm2101m300)
Use this session to view the details of the results for the action taken to resolve the failure reported in the FRACAS document.
Field Information
- FRACAS Number
-
The code of the FRACAS document.
- Description
-
The description or name of the code.
- Position
-
The position number of the FRACAS document.
- Disposition Order Origin
-
The order type created to execute the disposition.
Allowed values
- Rework (to Existing Specification)
- Rework (to New Specification)
- Reclassify
- Return to Vendor
- Scrap
- Use as is
- Repair
- No Fault Found
- Awaiting Disposition
Note:- This field is enabled only if:
- The Disposition Type field is set to a value other than Not Applicable.
- The Status of the FRACAS document is set to Dispositioned.
- This field can be set to:
- Order
-
The code of the order that is created to execute the disposition.
- Disposition Order Position
-
The line number linked to the order.
- Failure Cannot be Solved
- Failure Solved
-
Indicates if the registered failure has been resolved.
- Impact on Engineering Data Revision
-
Indicates if the resolution provided for the registered failure has an impact on the engineering data related to the revision of the item.
- Failure Solved Date
-
The date on which the registered failure is resolved.
- Failure Solved Remarks
-
Additional information related to the resolution provided for the registered failure.
- Status
-
The status of the linked FRACAS document.
Allowed values
- Open
- Assigned
- Dispositioned
- Closed
- Canceled
- Engineering Process
-
- Engineering Change Required
-
If this check box is selected, design or engineering changes are required for the item. These changes can be one of the reasons for the failure action to be reported.
Note:The check box is enabled only if:
- The Product Lifecycle Management Integration Implemented check box is selected in the Quality Management Parameters (qmptc0100m000) session.
- The item is Revision Controlled.
- Engineering Process
-
The business process ID. The ID is generated after the business process is created in the Dispatch (pdwfl1100m200) session.
- Related Order Company
-
The PLM company in which the business process is created.
- E-Item Revision
-
The revision of the engineering item.