BOM (pdsnp1501m100)
Use this session to view and maintain the BOM.
Field Information
- Snapshot
- The unique snapshot number.
- Parent Item
- The item code.
- Parent Revision
- The revision number of the parent item.
- Status
-
The status of the parent item.
Allowed values
- Draft
- Released
- Under Change
- Obsolete
- Created By
- The name of the user who creates the parent BOM.
- Created On
- The date and time when the BOM is created.
- Record Type
-
The type of record for maintaining snapshot.
Allowed values
- Original
- Final
- Default
- Change Type
-
Indicates the type of change.
Allowed values
- Not Applicable
- None
- Inserted
- Modified
- Deleted
- Find No.
- The number that enables you to compare the Item attributes and the attributes of the linked properties.
- Child Item
- The item code.
- Component Revision
- The revision number of the child item.
- Quantity
- The quantity of the item.
- Effective From
- The date from which the effectivity of the BOM is applicable.
- Effective To
- The date up to which the effectivity of the BOM is applicable. The application sets the date when a new revision of the item is released.
- Unit of Measure
-
The unit of measure used for the item. This value is defaulted based on the unit set selected.
- As Required
- Indicates the child items are required.
- Compliance Status
-
The compliance status of the item's supplier according to the standards and directives.
Allowed values
- No Data
- Pass
- Pass with Exemptions
- Fail
- Conditional Fail
- Partial Fail
- Not Relevant
- Not Applicable
- PLM Project
- The PLM project for which the component is created.
- Template
- The template defined for the item.
- xcad1
- The file name (used to replace references correctly in the assemblies) or collaboration information about objects.
- xcad2
- The file name (used to replace references correctly in the assemblies) or collaboration information about objects.
- xcad3
- The file name (used to replace references correctly in the assemblies) or collaboration information about objects.
- xcad4
- The file name (used to replace references correctly in the assemblies) or collaboration information about objects.
- xcad5
- The file name (used to replace references correctly in the assemblies) or collaboration information about objects.
- Standard Configuration
- Indicates if the item is produced with a standard configuration.
- CAD Instance Name
- The name of the variant in the CAD family.
- Disposition
- The attribute is used as a comment field to store data relating to placement of the component in the assembly.
- Position
- The position of the component item in the BOM.
- Company
- The ERP company used for comparison.
- Project (PCS)
- The ERP PCS Project (if applicable) used for comparison.
- Additional Information
-
The additional information related to BOM.
- Originating App
-
The application using which the BOM is created.
Allowed values
- ECM
- MSProject
- IMAN
- UG Manager
- Inventor
- ME10
- Altium
- DraftSight
- Jvue Markup
- SolidWorks
- ERP
- AutoCAD
- SolidEdge
- ProE
- Ug
- PLM
- MSOffice
- CatiaV5
- CatiaV4
- E-Source
- Lotus Notes
- CRM
- MSWord
- MSExcel
- MSPowerPoint
- MSOutlook
- Input/Output
-
Indicates if the item is for input or output.
Allowed values
- Input
- Output
- Material Relation
-
The material relationship with the BOM.
Allowed values
- Primary Product
- Co Product
- By Product
- Waste Product
- Active Ingredient
- Inactive Ingredient
- Primary Ingredient
- Formula Based
- Catalyst
- Recoverable
- Width
- The width of the item.
- Length
- The length of the item.
- Material Percent
- The percentage of material.
- Number of Units
- The number of units of the item.
- Scaling
-
The type of scaling.
Allowed values
- Batch
- Order
- Unit
- Child Unit
- Indicates if this is a child unit.
- Reference Material
- Indicates if any reference materials available for the item.
- Exception Present
- Indicates if any exception is specified for the item.
- Operation
- The action to be performed on the selected field or column.
- Work Center
- The code of the work center.
- Note Fn1
- The additional information related to item.
- Note Fn2
- The additional information related to item.
- Note Fn3
- The additional information related to item.
- Note Fn4
- The additional information related to item.
- Note Fn5
- The additional information related to item.
- Size Unit
- The additional information related to item.
- Phantom
- If this check box is selected, the item is considered as a phantom item.
- Skip to Production
- If this check box is selected, the item skips to production.
- Scrap Percentage
- The percentage of the item value that is considered as scrap.
- Scrap Quantity
- The item quantity that is considered as scrap.
- Originating App
-
The application using which the BOM is created.
Allowed values
- ECM
- MSProject
- IMAN
- UG Manager
- Inventor
- ME10
- Altium
- DraftSight
- Jvue Markup
- SolidWorks
- ERP
- AutoCAD
- SolidEdge
- ProE
- Ug
- PLM
- MSOffice
- CatiaV5
- CatiaV4
- E-Source
- Lotus Notes
- CRM
- MSWord
- MSExcel
- MSPowerPoint
- MSOutlook
- Approval Date
- The date on which the item is released.
- Security Access Level
-
The level of security access provided to the user.
Allowed values
- Unrestricted
- Restricted
- Confidential
- Secret
- Top Secret
- Item Type
-
The item type used for the project.
Allowed values
- Purchased
- Engineering Module
- Manufactured
- Product
- Generic
- Previous Revision
- The alpha numeric code of the existing revision of the item.
- Derived From
- The original item from which this item is copied.
- Derived From Revision
- The original item revision from which this file is derived.
- Category
- The code of the item category.
- Category Name
- The name of the item category.
- Business Process
- The business process for which the item is
required.
The application populates this value when the business process is in the progress. When the business process is completed, the value in this field is cleared.
- Modification
- Indicates if a mass BOM change (MBC) for the item is performed.
- Standard
- The standard of the item.
- Serialized
- If this check box is selected, the item is serialized.
- Lot Control
- If this check box is selected, the item is lot controlled.
- End Item
- If this check box is selected, the item is an end
item.
Only serialized items can be defined as end items. For the serial effectivity, at least one end item must be defined for a project.
- Cost
- The cost of item.
- Currency
- The currency in which the item cost is specified.
- Obsolete
- Indicates if the field is obsolete.
- In House
-
The warehouse in which the item is stored.
Allowed values
- PLM Origin
-
The item is created in PLM.
- ERP Origin
-
The item is created in Infor LN.
- Deleted
- Estimated Weight
- The estimated weight of a manufactured item.
- Customizable
- Indicates if the item can be customized.
- Size
- The default size of the item.
- Material
- The material from which the item is manufactured.
- Search Key 1
- The default search key used for quick retrieval of the item.
- Search Key 2
- The default search key used along with Search Key 1 and Signal Code for quick retrieval of the item.
- Engineering Item Reference
- The reference number of the engineering item.
- ERP Project
- The ERP project for which the item is created.
- Engineer
- The code of the employee who is assigned the engineer's role.
- Life Cycle
-
The stage at which the item is, in the production life cycle. This is used to track the item through the various phases (from design to production).
Allowed values
- In Design
- Approved to Production
- Released to Production
- Object Type
-
The category used to classify the object.
Allowed values
- Item
- Folder
- Maintenance Sales Order
- Maintenance Sales Order Item Lines
- Bill of Material
- Contracts
- Inspection Plans
- Inspection Plan Characteristics
- Serial End Item Header
- Serial End Item Components
- Opportunity
- Warehouse Order
- Business Process
- Planned Order
- Purchase Requisition Order
- Incident Number CAR
- Incident Number CAR1
- Incident Number CAR2
- Incident Number CAR3
- CUSAI Number
- Planned Item
- ERP Work Center
- Instruments
- Tool
- Installation
- Adjustment Order
- Adjustment Order Line
- Warehouse Receipt
- Match Approve Pur Inv
- Manufacturer
- Supplier
- Contractor
- Category
- File
- Hardcopy
- Business Process Comment
- ECM File
- ECM Document
- Purchase Order
- Purchase Order Line
- Sales Order
- Sales Order Line
- Production Order
- Service Order
- Routing
- Routing Line
- Fixed Asset
- Sales Quotation
- Sales Quotation Line
- Purchase Inquiry
- Purchase Inquiry Line
- ECM Project
- Charge Element
- Employee
- Business Partner
- Customer Business Partner
- Supplier Business Partner
- LOT
- Abstract Items
- Configuration Items
- Service Order Activity
- Project (TP)
- Project (PCS)
- E Item
- P Item
- Service Installation
- Installation Component
- Customize Routing
- Customize Routing Line
- ERP Task
- Generic
- ERP Machine
- Customized Item
- Service Call
- Service Contract
- Service Contract Quote
- Service Order Quote
- Service Quote Activity
- Reference Activity
- ECO
- Budget
- Feature
- Calculation Part
- Routing Sheet Budget
- Routing Sheet Operation
- Sales Activity
- Purchase Requisition
- Purchase Req Line
- SCH Sales Contract
- SCH Sales Contract Line
- SCH Purchase Contract
- SCH Purchase Cont Line
- Option
- NCR
- Abstract File
- Abstract Document
- Abstract BP
- Illustration
- Material
- Formula
- Markup
- Tessellation
- Plan Material Purchase Order
- Project Activity
- Labor Budget
- Equipment Budget
- Subcont Budget
- Sundry Budget
- Purchase Advice
- Purchase Advice Line
- Material Requisition
- Work Breakdown Structure
- System
- Document
- System Part
- Space
- Received Invoices
- Received Pur Invoices
- Received Pur Inv Line
- Serialized Items
- Serial Numbers
- Physical Breakdowns
- Work Order
- Work Order Activities
- Activity/Element
- The code of the project element or activity linked to the item.
- Long Lead Item
- If this check box is selected, the item is the long lead item.
- Drawing Reference
- The drawing reference is an alpha numeric text.
- Effectivity Indicator
-
...
Allowed values
- Date
- Unit
- Volume
- The volume of the item.
- Item Character
-
...
Allowed values
- Engineering Item
- Product
- Package
- Label
- Standard Component
- WBS
-
Used for Project integration to define project structure. For WBS of Item character, Budget Element ID is mandatory.
- WP
-
Used for Project integration to define project structure. For WP of Item character, Budget Element ID is mandatory.
- Project Item
-
Used for Project integration to define the project material or items.
- Tool
- Generic
- Feature
- Option
- Phantom
- If this check box is selected, the item is a phantom item.
- Recyclability
-
The level of recycling of the item.
Allowed values
- R1
- R2
- R3
- Service
- If this check box is selected, the item is a Service item and is included in the BOM for future maintenance and repairs.
- Locked By
- The name of the user who has locked the BOM.
- Date1
- The date and time when the BOM is created.
- Date2
- The date and time when the BOM is created.
- Date3
- The date and time when the BOM is created.
- Originating Item
- Indicates if the item is the basic model in the associated CAD system to which all the other members in the category are related.
- Logistic Template
- The default logistic template for the item.
- Create CAD File
-
Indicates if CAD file must be created for the item.
Allowed values
- Yes
- No
- Yes (Create Assembly)
- State
-
The physical state of the item.
Allowed values
- Solid
- Solution
- Powder
- Steam
- Melted
- Liquid
- Expiry Period
- The time duration by when the item expires.
- Expiry Duration Units
-
The units in which time duration is expressed.
Allowed values
- Minute
- Hour
- Day
- Week
- Month
- Formula Type
-
The type of formula.
Allowed values
- General
- Master
- Site
- Control
- Unit
- The quantity of the item on which the engineering BOM is based. The main purpose of this unit is to include very small quantities of a component in the engineering BOM.
- Text
-
Indicates if text is present for the item.