Rough Planning - Chart (fmrpg1700m000)
Use this session to display a chart that shows the weekly or monthly capacity based on rough planning.
Field Information
- Selection
-
- Shipping Office
-
The shipping office of the freight orders from which the shipment is created.
- Planning Group
- Transport Means Group
- Selection Range
-
- Consolidate Planning on
-
Select either of the following:
- Weekly Capacity Overview
- Monthly Capacity Overview
- Year
-
Default value: the current year.
- Month
-
Specify a start month and an end month, as required.
- Week
-
Specify a start week and an end week, as required.
- Planning Units
-
- Volume
-
The volume unit to be used in the overview. If required, you can overwrite the default values. The default values are specified in the Freight Master Data Parameters (fmfmd0100m000) session.
- Weight
-
The weight unit to be used in the overview. If required, you can overwrite the default values. The default values are specified in the Freight Master Data Parameters (fmfmd0100m000) session.
- Floor Space
-
The floor space unit to be used in the overview. If required, you can overwrite the default values. The default values are specified in the Freight Master Data Parameters (fmfmd0100m000) session.
- Options
-
- Include Actual Freight Orders
-
Expected, Planned, and Actual freight orders are aggregated in the total weight, volume, and floor space requirements displayed in the overview.
- Print Error Report
-
If this check box is selected, error reports are generated if errors occur.
- Print to predefined Device
-
If this check box is selected, LN selects the default device defined for the user profile to print the report.
Note: By default, this field is checked by LN.