Change Planned Load/Unload Date (fmfoc2201m000)

Use this session to carry out a collective date change for a range of freight order lines.

In this session you can change the Planned Load Date and Planned Unload Date and/or the Tolerance dates ( Earliest Load Date and Earliest Unload Date; Latest Load Date and Latest Unload Date) for a range of freight orders and freight order lines.

Date and tolerance changes are allowed for freight order lines with the following status:

  • Expected
  • Planned
  • Actual

To select the range of freight orders and freight order lines for which to change the planned load or unload dates, times, and tolerances, complete these steps:

  1. Select a shipping office and a planning group.
  2. Use the range fields to select the freight orders and freight order lines within the selected shipping office and planning group.
Note: The calculation buttons are unavailable if this session is started as a stand-alone session or started from the menu.

Field Information

Shipping Office

shipping office

Planning Group

planning group

Freight Order

freight order

Line

freight order line

Route Plan

Freight orders and freight order lines within this route plan range are selected.

Standard Route

Freight orders and freight order lines within this standard route range are selected.

Status

Freight orders and freight order lines within this status range are selected.

Allowed values

  • Expected
  • Planned
  • Actual
Planned Load Date

Freight orders and freight order lines within this planned load date range are selected

Planned Unload Date

Freight orders and freight order lines within this planned unload date range are selected.

Planned Load Date

The planned date and time on which loading is to take place at the ship-from location.

Planned

The planned time on which loading is to take place at the ship-from location.

Earliest Load Date

The earliest date on which loading can take place at the ship-from location.

Earliest

The earliest time on which loading can take place at the ship-from location.

Latest Load Date

The latest date on which loading can take place at the ship-from location.

Latest

The latest time on which loading can take place at the ship-from location.

Planned Unload Date

The planned date on which unloading is to take place at the ship-to location.

Planned

The planned time on which unloading is to take place at the ship-to location.

Earliest Unload Date

The earliest date on which unloading can take place at the ship-to location.

Earliest

The earliest time on which unloading can take place at the ship-to location.

Latest Unload Date

The latest date on which unloading can take place at the ship-to location.

Latest

The latest time on which unloading can take place at the ship-to location.

Latest

If this check box is selected, a report of the errors that occurred during the date and time change process is printed.

For example, an error occurs if a standard route is specified for a freight order line, and the changed loading or unloading dates conflict with the standard route schedule.

Errors do not stop the process, but freight order lines for which errors occur are listed on the error report.