Additional costs - shipment based
Shipment-based additional costs are calculated for sales shipments or shipment lines. After confirmation of a shipment (line), a sales cost order is generated based on the shipment (line). A sales cost order with the Shipment origin includes all additional costs for one shipment (line).
Note
- Multiple sales order lines and sales schedule lines can be linked to one shipment.
- The sales shipment cost order and the order/schedule lines that are linked to a shipment, receive a common shipment ID. Based on this ID, a complete shipment can be invoiced to the customer. The relevant order/schedule lines and the sales shipment cost order can be released to invoicing together.
The shipment-based additional costs procedure includes these steps:
Additional cost calculation for shipments/shipment lines
The calculation of additional costs for shipments/shipment lines is based on the value of the Calculation Method field in the Sold-to Business Partner (tccom4110s000) session. For the shipments, the Calculation Method must be Header Based; for the shipment lines, it must be Line Based.
The additional costs are calculated for sales orders and sales schedules if the Calculate Additional Costs for Shipments check box is selected in the Inventory Handling Parameters (whinh0100m000) session.
-
Sales orders
The additional costs are calculated with the cost set of the business partner (and/or item). - If the Calculation Method is Header Based in the Sold-to Business Partner (tccom4110s000) session, the additional cost lines are based on totals per shipment and the link to the originating shipment line is not saved.
- If the Calculation Method is Line Based, the additional costs are calculated for every originating order line and the link to the originating shipment line is saved.
-
Sales schedules
The Header Based additional costs are calculated with the cost set of the business partner (and/or item). The additional cost lines are based on the totals per shipment and the link to the originating shipment is not saved. - The Line Based additional costs are calculated for the cost set of the contract. This calculation is always independent of the Calculation Method. The generated additional cost lines are linked to the originating order line. The quantities of all the shipment lines can be added before the costs are calculated. This is applicable for serials in inventory that have multiple shipment lines per order line.
In the Print Packing Slips (whinh4475m000) and Print Delivery Notes (whinh4477m000) sessions, the header based additional costs are printed first. The line based additional costs are printed below the linked shipment line.
- For confirmed shipment lines, the additional costs are recalculated if the status of the additional cost line is Not Calculated. If the status is Modified, LN checks if you want to recalculate additional costs or skip the recalculation. After the additional costs are recalculated, the Additional Costs field in the Shipments (whinh4130m000) session is set to Calculated.
- When you compose a shipment in the Compose Shipment (whinh4231m000) session, the related additional cost lines must be
processed for the selected options.
If, on the appropriate menu, you click:
- Split Line, the status of the originating shipment line is reset to Modified and the additional cost lines are removed. While confirming the originating line, the additional costs are recalculated.
- Move to Shipment, the additional costs of the originating shipment line are moved to the new shipment line.