Project Resource Plan Chart (Modify Chart) (cprrp0732m100)

Use this session to manage data from your resource master plan in a graphic format.

Field Information

Scenario

Specify the scenario for which LN must draw a chart of the planning data for the specified work center.

Plan Level

The plan level of the plan items that use the work center for which LN must draw a chart.

Work Center

The work center for which the chart is drawn.

Project

The project for which LN must draw a chart.

Start Date

The requested start date for the chart.

Period Length

The period length for the division of the time scale of the chart.

Number of Periods in View

The maximum number of periods shown on the chart.

CTP Reservations

If this check box is selected, the chart displays the capacity used for capacity CTP reservations.

Critical Capacity Requirements

If this check box is selected, the chart displays the capacity used for critical capacity requirements.

Planned Production Orders

If this check box is selected, the chart displays the capacity used for planned production orders.

Production Orders

If this check box is selected, the chart displays the capacity used for production orders.

PCS Activities

If this check box is selected, the chart displays the capacity used for PCS activities.

Service and Maintenance Orders

If this check box is selected, the chart displays the capacity used for service orders and maintenance orders.

Show Total Required Capacity

The total required capacity for the specified production order.

Show Total Available Capacity

Show the total available capacity of the specified work center.

Graph Type

The type of chart to be drawn.

Note: This is only an initial setting. Once the chart is displayed, you can switch from one chart type to another.