Resource Order Plan Chart (Modify Chart) (cprrp0731m100)
Use this session to display data from your resource order plan in a graphical format.
To display data:
- Specify a scenario and a plan level.
- Specify a work center.
- Specify the start date, the period length, and the maximum number of periods for the chart.
- Specify the type of data you want to view.
- Select a chart type.
- Click the button.
Most types of data shown in the chart correspond to fields in the resource order plan (see the Resource Order Plan (cprrp0530m000) session).
Field Information
- Scenario
-
Specify the scenario for which LN must draw a chart of the planning data for the specified work center.
- Scenario
-
The description of the scenario.
- Plan Level
-
The plan level of the plan items that use the work center for which LN must draw a chart.
- Work Center
-
The work center for which LN must draw a chart.
- Start Date
-
The requested start date for the chart.
- Period Length
-
The period length for the division of the time scale of the chart.
- Number of Periods in View
-
The maximum number of periods shown on the chart.
- CTP Reservations
-
If this check box is selected, the chart displays the capacity used for capacity CTP reservations.
- Critical Capacity Requirements
-
If this check box is selected, the chart displays the capacity used for critical capacity requirements.
- Planned Production Orders
-
If this check box is selected, the chart displays the capacity used for planned production orders.
- Production Orders
-
If this check box is selected, the chart displays the capacity used for production orders.
- PCS Activities
-
If this check box is selected, the chart displays the capacity used for PCS activities.
- Service and Maintenance Orders
-
If this check box is selected, the chart displays the capacity used for service orders and maintenance orders.