Plan Unit (cprpd6100m000)
Use this session to display and maintain plan units.
Before you define plan units, you must determine which plan items you want to group to a plan unit, because they must use the same critical materials and the same critical capacities.
You can assign a plan items to a plan unit in the Master Plan Unit field in the Items - Planning (cprpd1100m000) session.
In the Master Planning Method field you can select the master-planning engine that LN must use to plan the plan unit.
Field Information
- Plan Unit
- Master Planning Method
-
The master planning engine indicates which optimization algorithm will be used to generate master plans for the plan items of a plan unit.
Note: Specify the hosts and servers for the planning engine in the Planning Parameters (cprpd0100m000) session. - Master Phase Number
-
The phase number for master planning.
Default value
By default, LN sets the phase number to zero.