Job Shop Planning Bill of Material (cprpd3646m000)
Use this session to insert, update or delete Job Shop Planning Bills of Material.
Note: This session can be accessed only if the Configurations by Site field is set to Active or Enterprise Model in Preparation in the Implemented Software Components (tccom0100s000) session.
Field Information
- Product
- The code of main item of the job shop planning
bill of material.Note: The product must be a generic plan item.
- Production Site
- The code of source site of the job shop planning
bill of material.Note: This field is defaulted from the production site of the product.
- Revision
- The revision number of the job shop planning bill
of material.Note: The revision number cannot be modified manually.
- Status
-
The status of the job shop planning bill of material.
Note: The status cannot be modified manually.Allowed values
- New
- Approved
- Expired
- BOM Quantity
- The quantity of the job shop planning bill of
material.Note:
- The BOM Quantity can be modified only if the status is New.
- The BOM Quantity is defaulted with 1.0.
- The BOM quantity needs to be rounded on the inventory unit.
- Effective Date
- The date and time from when the job shop planning
bill of material is effective.Note:
- The effective date can be modified only if the Status is New.
- The effective date is defaulted from the current date.
- Expiry Date
- The date and time up to which the job shop
planning bill of material is effective.Note:
- The expiry date can be modified only if the Status is New.
- The expiry date is defaulted with the maximum UTC date.
- The expiry date must not fall before the effective date.
- Created By
- The employee who creates the job shop planning bill of material.
- Created By Description
- The description of theCreated By .
- Created On
- The date and time when job shop planning bill of material is created.
- Approved By
- The employee who approves the job shop planning bill of material.
- Approved By Description
- The description of the Approved By.
- Approved On
- The date and time when the job shop planning bill of material is approved.
- Expired By
- The employee by whom the job shop planning bill of material is set to Expired.
- Expired By Description
- The description of the Expired By.
- Expired On
- The date and time when the job shop planning bill of material is set to Expired.