Validate Subcontracting Planning Model (cprpd3260m000)
Use this session to validate the Subcontracting Planning Models.
This session checks whether the material lines are defined, and loops are detected. The application displays a warning message if the planning percentage or planning quantity for a position and sequence number is zero or when the planning percentages of all lines of the same position is not 100 percent.
Note: This session can be accessed only if the Configurations by Site field is set to Active or Enterprise Model in Preparation in the Implemented Software Components (tccom0100s000) session.
Field Information
- Selection Range
- Use the fields in the Selection Range group box to validate the subcontracting planning models.