Job Shop Planning Routing Operations (cprpd3157m000)
Use this session to insert, update or delete Job Shop Planning Routing Operations.
Note: This session can be accessed only if the Configurations by Site field is set to Active or Enterprise Model in Preparation in the Implemented Software Components (tccom0100s000) session.
Field Information
- Product
- The code of the main item of the job shop planning routing operation.
- Production Site
- The code of source site of the job shop planning routing operation.
- Revision
- The revision number of the job shop planning routing operation.
- Operation
- The operation number of the job shop planning routing operation.
- Sequence Number
- The sequence of the operation.Note: When a new operation is created for existing operation, the value is updated with the next available sequence number.
- Subcontracting
- If this check box is selected, the operation is subcontracted.
- Machine Type
- The machine type of the reference operation.Note: The machine type is updated with the machine type of the reference operation.
- Work Center
- The work center of the reference operation.Note: The work center is updated with work center of the reference operation.
- Reference Operation
- The reference operation.Note: The reference operation must be defined for the Site and Work Center.
- Planned Setup Time
- The expected setup time for the specified operation.
- Planned Cycle Time
- The planned cycle time of the reference operation.
- Planning Percentage
- The planning percentage of the reference operation.
- Lead Time Offset
- The lead time offset of the operation.
- Lead Time Offset Unit
- The unit in which Lead Time Offset expressed in
units.
Allowed values
- Hours
- Days
- Labor Resources for Setup (FTE)
- The number of the labor resources for setup.
- Labor Resources for Production (FTE)
- The number of labor resources for production.
- Number of Machines
- The number of machines for the specified operation.