Resource Capacity (Operation Capacity) (cprpd2102m400)

Use this session to display subcontractor operation capacity for a production site.

Operation capacity is expressed in hours, per subcontractor site or per reference operation.

Field Information

Resource

The resource ID.

Reference Operation

The reference operation ID.

Resource Type

The type of resource.

Allowed values

Resources can be of the type:

  • Work Center
  • Work Cell
  • Work Cell Machine
  • Machine Capacity Group
  • Operation Capacity
  • Production Capacity
  • Supplying Cluster
  • Supplier
Capacity Type

The type of capacity that applies to the resource.

Allowed values

  • Labor
  • Machine
  • Item
Capacity Type Unit

The unit type in which capacity is defined.

Allowed values

  • Hours
  • Days
Capacity Type Bucket

The capacity bucket of the specified resource has:

Allowed values

  • Relative Dates
  • Fixed Dates
Subcontractor

The subcontractor that is part of the resource.

Subcontractor Site

The subcontracting site ID.

Production Site

The site where production takes place, or for which product is produced.

Planning Cluster

The planning cluster ID for which the resources are displayed.

Constraint

The type of constraint the resource has.

Planning Bucket

The planning bucket the resource uses is:

Allowed values

  • 1 Week
  • 2 Weeks
  • 4 Weeks
Target Max Utilization

The target maximal utilization of the resource that should be achieved during planning.

Critical

If this check box is selected, the selected resource is critical to planning.

Capacity

The operation capacity of the resource in units.

Graph

The graphic representation of the resource capacity.

<

The button to move the graph to the left.

>

The button to move the graph to the right.